ST9302-LR010716 (3) ALPHA TESTING, INC.
2209 Wisconsin St,, Suite 100
Dallas, Texas 75229
972/620-8911- 972~263-4937(Metro) DAILY FIELD REPORT
FAX: 972/406-8023
TESTED FOR: CITY OF COPPELL DATE: 07/16/01
COPPELL, TEXAS
PROJECT: SANDY LAKE ROAD PROJ. NO. ST 93 OUR REPORT NO: 98881-209
COPPELL. TEXAS
TECHNICIAN: C.T.
WEATHER: CLEAR TEMPERATURE RANGE: 97 TO 98
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
A TOTAL OF 3 FIELD DENSITY TESTS WERE PERFORMED ON STABILIZED SOIL FOR PAVING SUBGRADE. SEE
ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING.
WHILE ON SITE THE TECHNICIAN PERFORMED I FIELD GRADATION TEST ON LIME STABILIZED MATERIALS.
SEE ATTACHED REPORT FOR TEST RESULTS.
G. CAMPBELL WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
CC:
ED BELL CONSTRUCTION
Respectfully Submitted,
~ ?. epolts are for .the, exclu, slve use of tt~e chent (~nd their designated recipients on file in our office) an~~buted~except with express approval of
ALPHA. ~ne use o~ our name aha ~es! results must recmve our written approval. Test results and reports apply only to the samples t bse re not indicative of the qualities of
apparently identical or similar specimens.
Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting