WA9302-LR 960514I"~'EOTECHNICAL
E GEE Consultants, Inc.
E NVIRONMENTAL
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date May 14, 1996 Test Date: May 9, 1996
Client City of Coppell General Report No.: 27
Project 6.0 MG Water Storage Tank Project No.: 95-196
Identification Reinforcing Steel Placement Inspection
Method of Test Visual Inspection
Page 1 of 1
Results
On May 9, 1996, reinforcing steel was inspected at the following locations:
Flume
The following discrepancies were noted an called to the attention of Brian, a representative of Natgun
Corporation:
Chairs for the reinforcing steel were not used.
The above discrepancies were corrected as noted.
Tech.: Don
cc: Mr. Larry Davis - City of Coppell
Mr. Gary Hendricks - Shimek, Jacobs and Finklea