Loading...
Gateway BP(3.1)-CS010419 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: GATEWAY BUSINESS PARK NO. 3 LOTS 1 & 1X, BLOCK A REVISED SITE PLAN AND FINAL PLAT P & Z HEARING DATE: April 19, 2001 C.C. HEARING DATE: May 8, 2001 LOCATION: At the northeast comer of Freeport Parkway and Airline Drive. SIZE OF AREA: Approximately 7.864 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Final Plat and Site Plan Amendment approval for two 32,758 square foot office buildings. APPLICANT: Park West Commerce Center Halff Associates, Inc. 15350 SW Sequoia Pk~j Chris Amarante Suite 300 8616 Northwest Plaza Drive Portland, OR 97224 Dallas, TX 75225 (503) 624-6300 (214) 346-6200 FAX: (503) 624-7755 (214) 739-0086 Architect: O'Brien & Associates Mick Granlund 5310 Harvest Hill Road, Suite 136 Dallas, TX 75230 (972) 788-1010 FAX: (972) 788-1024 HISTORY: The City Council approved the Preliminary Plat and Site Plan, excluding elevations, for the subject site on April 10, 2001. There is no prior platting history on the subject site. TRANSPORTATION: Airline Drive is a C4U, four-lane undivided street built to standard, within a 60-foot right-of-way. Freeport Parkway is a four-lane divided Item # 8 road in an 80'-wide right-of-way. Freeport Parkway is proposed to be expanded to a six-lane roadway in a 1 lO'-wide right-of-way. SURROUNDING LAND USE & ZONING: North- vacant land; LI, Light Industrial South - vacant land/G&K Services; LI, Light Industrial East- Park West Commerce Center sign/MJ Designs; LI, Light Industrial West - Avaya Telecommunications; LI, Light Industrial COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for light industrial/show~'oom uses. DISCUSSION: The applicant is requesting Revised Site Plan and Final Plat approval for Lots 1 and 1X, Block A of Gateway Business Park No. 3, subdividing the 7.864 acres of property into two separate lots. Development v,411 occur on Lot 1, containing 5.241 acres, while the remaining 2.414 acres containing the floodplain area of Grapevine Creek will make up Lot 1X. An additional .2090 of an acre will be dedicated as right-of-way along Freeport Parkway. The applicant is proposing to construct two 100% office buildings, providing a total of 256 parking spaces, well over the required 218 spaces. As stated in the above case History, Planning Commission and City Council recently approved the Preliminary Plat and Site Plan, which excluded building elevations. The approval was conditional upon elevations being submitted in conjunction with the request for Final Plat approval. All other aspects of the site plan, landscape plan, and plat have been reviewed and approved; however, a complete site plan package is included for reference. Architecture Because details on building materials were not finalized at the time that the Site Plan and Preliminary Plat were reviewed, the architectural details and building elevations will now be revie~ved in conjunction with Final Plat approval. The two proposed buildings will be one-story, each containing an approximate building area of 32,758 square feet. Because the building has been designed for office uses only, a significant number of windows are proposed to be located on all four sides of the building. The building height will measure 21.9', except where enhanced entrances are proposed to be slightly higher (approximately 2.5') than the remainder of the building. The primary building material will be an autumn rose brick. A darker brick will be placed around the base of the buildings and as accent bands spaced every 1 ½' feet, halfw~ up the building walls. Beige (Urban Putty) cast stone Item # 8 will surround all entranceways, with matching painted concrete arotmd all windows and at the top edge of the building. Final Plat Lot 1X is located within a floodplain area of Grapevine Creek. The applicant has placed a note on the plat indicating that maintenance of the floodplain/easement area is the responsibility of the owner. Additionally, the applicant submitted a letter in conjunction with the Preliminary Plat, specifically committing to the removal of trash and brush, grading, hydromulching, temporary irrigation as necessary, and general maintenance of the drainage channel. Additionally, as requested by staff, the applicant has added a 5' wide sidewalk easement along Airline Drive, in case of future sidewalk construction. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of the revised site plan and final plat. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Final Plat (Sheets 1 & 2) 2) Site Plan 3) Elevations 4) Landscape Plan (Sheets 1 & 2) 5) Landscape Details 6) April 2, 2001 letter regarding maintenance of floodplain area Item # 8 Ap¥"-03-01 02:55P O'B RI EN & ASSOCIATES, IN C A R C HI T E C T U R E · P L A N N I N G ,, I N T E R I O R S MEMO FAX ~,/ PHONE MTG. FILES Date: 4/02/01 To: Ms. Andrea Roy City of Coppell Re: Gateway Business Park, No. 3, Lot I Blk A Concerning the improvements to the drainage channel, the owner is willing to commit to the fo/lowing; 1. Removal of trash and brush down to the creek bed similar to adjacent landowners. 2. Fine grading as required within the channel area. 3. Hydromulch the channel with Common Bermuda mix. 4. Provide temporary, irrigation as required to establish growth. 5. Provide ongoing maintenance to inciudi~ mowing and trash removal. tfyou have further questions please feel free to contact me. Sincerely, ? _ Mick Granlund 5310Harves~HillKoad · Suite136. LB I61 · Dallas. TX 75230 · {972)788-1010 · FAX (972) 788-4528