WA9302-LR 960408EOTECHNICAL
E GEE Consultants, Inc.
E~ NVIRONMENTAL
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: April 8, 1996 Date Concrete Placed: March 22, 1996 Standard 6"x12"
Client: City of Coppell Area 28.27 Square Inches
Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 148
Contractor: Natgun Corporation Project No.: 95-0196
Concrete Supplier and Ham: RediMix Concrete - Plant #1
Location of Placement: Cove
MATERIALS so.~/ h~. w~. INSPECTION DATA
Description (Lbs ./Cu. Yd)
Mix Number: 688/Mix E Time Sample Batebed: 10:31 pm
Cement: Time Sampled: 11:30 pm
Fly Ash: Sample Location:
Truck/Ticket No: 170/12209
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Fine Aggregate: Concrete Range: 80°F
Admixtures: Slump Range (inches): 1"
Weather Conditions: Clear
1 Time Started: 9:45 am
2 Superplasticizer Time Completed: 1:45 pm
Added Water: 25 Gal. Sample Air Content (%): 8.0%
Total Cubic Yards Placed: 6.0 C.Y.
Required Strength (Lbs./sq.in.): 6,000 psi
F:emarks and/or Distribution:
co: Mr. Larry Davis - City of Coppell
Mr. Gary Hendricks - Shimek, Jacobs and Finklea
GIR Consultants, Inc. Reviewed