Loading...
WA9302-LR 960408EOTECHNICAL E GEE Consultants, Inc. E~ NVIRONMENTAL 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: April 8, 1996 Date Concrete Placed: March 22, 1996 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 148 Contractor: Natgun Corporation Project No.: 95-0196 Concrete Supplier and Ham: RediMix Concrete - Plant #1 Location of Placement: Cove MATERIALS so.~/ h~. w~. INSPECTION DATA Description (Lbs ./Cu. Yd) Mix Number: 688/Mix E Time Sample Batebed: 10:31 pm Cement: Time Sampled: 11:30 pm Fly Ash: Sample Location: Truck/Ticket No: 170/12209 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 70°F Fine Aggregate: Concrete Range: 80°F Admixtures: Slump Range (inches): 1" Weather Conditions: Clear 1 Time Started: 9:45 am 2 Superplasticizer Time Completed: 1:45 pm Added Water: 25 Gal. Sample Air Content (%): 8.0% Total Cubic Yards Placed: 6.0 C.Y. Required Strength (Lbs./sq.in.): 6,000 psi F:emarks and/or Distribution: co: Mr. Larry Davis - City of Coppell Mr. Gary Hendricks - Shimek, Jacobs and Finklea GIR Consultants, Inc. Reviewed