Loading...
Gateway BP(2.5)-CS 980723 The City With A Beaut' ~ RO. BOX 478 COPPELL, TEXAS 75019 Larry Baker G & K Services, Inc. 5995 Opus Parkway Minnetomka, MN 55343 Gateway Business Park (G & K Services, Inc.) Development Fee Assessment P.O. Box 478 Coppell, Texas 75019 972-462-0022 July 23, 1998 Dear Mr. Baker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $72,153.68 .ax~?l forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees· Also provide a copy of the Engineer's estimate or contract to our office ' so the construction inspection fee can be verified· Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. · Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gm3, Sims, Director of Leisure Services b VELOPMENT FEE TABLe, Project: Gateway Business Park (G & K Services, Inc.) Date: 7/23/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,956.65 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fircline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permi0 Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $53,028.68 $53,028.68 (100% due prior to Council Approval) Street Light Fee Iaformation not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts] TOTAL $78,535.33 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $72,153.68 DEVELOPMENT FEE WORKSHE. r PROJECT: Gateway Business Park (G & K Services, Inc.) DATE: 7/23/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 3 inch = 16 ESU's 1 - 2 inch = 8 ESU's = ESU's 2 - 8 inch = 2.5 ESU's Total #: 26.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total 0: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $192.15 $2,882.25 Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) ~ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $11,925.00 $200.00 $0.00 $192.15 $0.00 $5,764.50 $35.00 $90.00 $7,200.00 $50.00 $50.00 Page 3 DEYELOPMENT FEE WORKSHE,- r Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00/Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $53,028.68 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for pdvate improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 4 ROAL NAY IMPACT FEE CALCULAx ~tONS PROJECT: DATE: Gateway Business Park (G & K Services, Inc.) 7/23/98 ROADWAY IMPACT FEE: Service Area * 10 Category ** Industrial Land Use ** Others / Not Specified (Industrial) Building Size (Sq. Ft.) 67,725 Development Units ** 67.725 Vehicle Miles per Development Unit ** 2.61 $300 Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x _(_Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $53,028.68 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) This fee is eligible for up to a 50% credit do to the original developer constructing Lakeshore & Crestside Drives. To Receive this credit a letter from the original developer needs to be submitted assigning some of the credits for this development.