Loading...
Gateway BP(2.5)-CS 980429PLANNERS SURVEYORS , ~*~ ~ gO' ~pril 29, 1998 Mr. Kenneth Griff'm ~ p.e~. c/o Michael Martin, ~'. ~.. City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019-4409 Dear Mr. Griffin, Halff Associates, Inc. would like to submit an alternative pavement design for the G&K Laundry Services Facility. For the parking area, the alternative design is 5 inch thick 4000 PSI compressive strength concrete with #3 bars, 18 inch O.C.E.W. on compacted subgrade in lieu of the 5 inch thick 3000 PSI compressive strength concrete with #3 bars, 24 inch O.C.E.W. on 6 inch lime stabilized subgrade as shown in Appendix C of the City of Coppell Subdivision Ordinance. For the truck courts, the altemative design is 7 inch thick 4000 PSI compressive strength concrete with #3 bars, 18 inch O.C.E.W. on compacted subgrade in lieu of the 6 inch thick 3000 PSI compressive strength concrete with #3 bars, 24 inch O.C.E.W. on 6 inch lime stabilized subgrade shown in Appendix C of the City of Coppell Subdivision Ordinance. For the fire lane, the alternative design is 6 inch thick 4000 PSI compressive strength concrete with #3 bars, 18 inch O.C.E.W. on compacted subgrade in lieu of the 6 inch 3000 PSI compressive strength concrete with #3 bars, 24 inch O.C.E.W. on 6 inch lime stabilized subgrade shown in Appendix C of the City of Coppell Subdivision Ordinance. If you have any questions or require any additional info~nnation, please contact Pat Acker or myself. Sincerely, HALFF ASSOCIATES, INC. Todd Abbott, E.I.T. cc: Chris Neufeld DALLAS · FORT WORTH · HOUSTON · ARLINGTON · McALLEN ° CHICAGO TRANSPORTATION ° WATER RESOURCES " LAND DEVELOPMENT · MUNICIPAL · ENVIRONMENTAL · STRUCTURAL MECHANICAL ° ELECTRICAL" SURVEYING · GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING