Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
WA9302-LR 960404 (2)
-- 7 [~1EOTECHNICAL E GEE Consultants, Inc. EI NVIRONMENTAL 10046 Monroe Drive * Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 lIEPORT OF CONCRETE MIX INSPECTION lieport Date: April 4. 1996 Date Concrete Placed: February 21, 1996 Standard 6"x12" Clicnt: City of Coppell Area 28.27 Square Inches P'oject: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 145 C antfactor: Natgun Corporation Project No.: 95 -0196 Cm;crete Supplier and Plant. RediMix Concrete - Plant #l Location of Placement: Wall S lots P IATERIALS ~ .......: '~"'~" '~'~' INSPECTION DATA I )csc ripmn~ ( Lhs./Cu Yd) , ._ N !i~ NkuBbcr 689 Time Sample Batched: 1:00 pm Ccl ~cm: Time Sampled: 1:30 pm I b' Ash: Sample Location: #4-15 Truck/Ticket No: 189/10406 ( ol, rse Aggregate: Temperature: l! ttcrn~cdiatc Aggregate: Ambient Range: 93°F l:inc Aggregate: Concrete Range: 82°F ,,x dmixtures: Slump Range (inches): 63~" Weather Conditions: Clear ! Time Started: 10:30 am 2 Time Completed: 4:15 pm ,added Water: 30 gal. Satnple Air Content (%): Total Cubic Yards Placed: 16.5 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi 5;pccimcn Mcaskllcd I Age [ Date ] Total l,oad Conlprcssivt: Strgllglh ~lumbcr 5ilun/n ~m~ (I)ays~ Tested (I,,bs.l (Lbs./Sq. ln.) Remarks ('WT 497 6~,5" 7 89/98/96 !81 980 6 410 CWT 498 6%" ( 28 [ 03/20/96 ~ 191,120' 6,760* t:WT 499 6 h" 28 03/20/96 191,200* 6,760* ['C [ ~k'jjlt)dS I,]UJi:/C([ Ir/atlt~rcRegular _ X', M ( 31.( ~9 (' ~4= tt 'nlkss Noled Olherwise) Cylinders Made By: S.J. ~ eraarks and/or Distribution: Slump was %" befi~re super was added. * Tests were not carried out until failure. Mr. Larry I)av~s City of Coppell Mr. GaD Ilendricl, s Shimck, Jact)hs and Finklea II:{g Consultants, ~c. _ 'C