Loading...
Lakeside V1-CS 940915 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: LAKESIDE VILLAGE ADDITION, REPLAT OF PART OF LOTS 2 AND 3 P & Z HEARING DATE: September 15 1994 C. C. HEARING DATE: October 11, 1994 LOCATION: Northwest corner of Sandy Lake Rd. and MacArthur Blvd. SIZE OF AREA: 2.6587 acres for a day care center for approximately 180 students CURRENT ZONING: (C) Commercial REQUEST: To allow the use of a day care center on Lot 3-B. APPLICANT: John B. Butler The Nelson Corporation (Owner) (Engineer) 6905 Chevy Chase 5999 Summerside Drive, Ste. 202 Dallas, TX 75225 Dallas, TX 75252 HISTORY: There has been rezoning and subdivision activity west and north of the subject tract over the last eighteen months, all for residential' development. TRANSPORTATION: MacArthur Blvd. is a P6D, six-lane divided thoroughfare built in a 110 foot r.o.w.; Sandy Lake Rd. is a C4D/6, four-lane divided in a six-lane divided r.o.w, of 110 feet width. Item 5 SURROUNDING LAND USE & ZONING: North - existing single-family; PD-125 SF-7 South - existing single-family; TH-1 East existing commercial; C West - vacant commercial; C COMPREHENSIVE PLAN: The Plan shows this area to be utilized for commercial uses. ANALYSIS: This preliminary plat is submitted for the possible construction of an 8000 square foot day care center. Although some concern has been expressed with locating a day care center at the intersection of two major streets and across the street from an elementary school (which could lead to additional traffic congestion at peak hours), the site plan submitted with this plat attempts to address staff concerns. Our parking requirements have been met, the landscaping abides by our streetscape ordinance, the circulation system recognizes the adjacent vacant tracts, and overall the plan can be implemented. This results in a question regarding whether this use is the most appropriate for the location. Staff would point out, however, that what we are dealing with here is a preliminary plat which appears to meet all platting requirements. As has been pointed out by legal counsel in the past, if the plat meets our development guidelines, the use contemplated is secondary. Although the Planning Director has questioned that line of thought, the fact remains we are dealing with a preliminary plat here. The final question relates to the Master Plan suggesting commercial development, and a day care center is typically more identified with residential usage. If the applicant can present a solid case which justifies this center, approval would be in order. If that is the position of the Commission attention is directed to the attached Engineering comments. ALTERNATIVES: 1) Approve the replat 2) Deny the replat 3) Modify the replat ATFACHMENTS: 1) Replat 2) Day care site plan 3) Departmental comments