Lakeside V1-CS 940728 DEVELOPMENT REVIEW COMMI EE
ENGINEERING COMMENTS
ITEM: Lakeside Village Addition. Replat of part of Lots 2 and 3, to allow the
use of a day care center on Lot 3-B, located at the northwest comer of
Sandy Lake Road and MacArthur Blvd., at the request of The Nelson
Corporation.
DRC DATE: July 28,1994 & August 4,1994
CONTACT: Ken Griffin, P.E., Assistant CiO' Manager/CiO' Engineer (393-1016)
COMMENT STATUS: INITIAL ,/PRELIMINARY FINAL
1. Right-of-way should be dedicated to provide a minimum of 55 feet from center line for both
MacArthur Blvd. and Sandy Lake Road. Sandy Lake is currently under design. Please
comact my office to obtain exact dimentions of the right-of-way dedication for Sandy Lake
Road.
2. The standard floodplain note for the floodplain administrator's signature should be provided
on the face of the plat.
3. The signature block for the Mayor should be provided.
4. Please explain the meaning of note #1 concerning selling off portions of the addition by
metes and bounds.
5. Once again it appears as though a portion of lot 2 is being included in lot 3. Because this
is already platted, does lot 2 need to be included in this replat?