Gateway BP(1.2)-LR 9609254747 Irving BlwL, Suite #20~
Da~s, Texm 7.~47
Date of Service:
Client No.:
Client:
Services:
09/25/1996 Report No.: 9610381
13195000
Project No.: 43-1452-96
Catellus Development Corporation Project: Fritz Gateway-Warehouse
Mr. Steve Williamson LBJ ~ Cotton & Gateway
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
cowrR~CrOm Haws & Tingle
CONCRETE SUPPLIER: TXI
rLANT: 31
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
SLUMP: 5" Max
nm: N/A
rwqr MV. rHOD: ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEA~U~
MARKED SLUMP
SET NO. Omeh~)
PROJECT DATA
coNcatm~ CLASS: 47
PLACEMENT DATE: 09/25/1996 BATCH TIME:, 3:38 am
TIMESAMPLgD: 4:20 am BY: Roy Montgomery
WEATHER CONDITIONS:
T~UCK NO: 571
AIR CONTV_~ (%): N/A
PLACEMENT LOCATION:
Clear
76 r CONCR]~rE: 82 F
TICKET NO: 670713
t~r wmon'r fl-:0: N/A
Wall panels: 66, 67, 68, 10, 11, 72, 73, 74, 75, 76,
and 77
SAMPLE LOCATION: Panel # 76
REPORT OF TESTS ACCUM YARDS: 30
DATE AGE LOAD STRENGTH FRA~
TESTED (days) 0ha. force) (j~l) TYPE
1 1 5.5 10/02/1996 7 127250 4500
1 2 5.5 10/02/1996 7 126660 4480
1 3 5.5 10/23/1996 28
1 4 5.5 10/23/1996 28
01AS This report is exclusively for the use of the client indicated above and shall not be tztm~duced except in full without the written approval of HBC Page I
CONCRETE
4747 lrvi~ Blvd., ~ #206
I~nm% Te.~ma 75247
Date of Service: 09/25/1996
Client No.: 13195000
Client:
Services:
Report No.: 9610381
Project No.: 43-1452-96
Catellus Development Corporation Project: Fritz Gateway-W~ehouse
Mr. Steve Williamson LBJ ~ Cotton & Gateway
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of fresh concrete at the plaeemeat locations, perform required field test and east oompressive
strength samples.**
Co~vrRAcrog: Haws & Tingle
CONCe.~X~ s~rr~r_~t: TXI
?~t~: 31
SrI~IFICATION
ST~-'rH: 3500 psi ~ 28 Days
Aim N/A
TgS'r METaOD: ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
2 1 5.25
2 2 5.25
2 3 5.25
2 4 5.25
PROJECT DATA
coNcmt,~ cu_Ass: 47
PLACEMEI~DATE: 09/25/1996 BATCHTIME: 5:03 am
TIME SAMPLED: 5:40 am BY: Roy Montgomery
WEAT~R CONDITIONS:
TEMPERATURE (F) - AIR
TgUCKNO: 483
Am co.rEar (./.): N/A
PLACEMENT LOCATION:
Clear
76 r CONCam~: 80 F
~ICXtrr No: 6700788
UNIY WEIGItT (lnt): N/A
Panels
SAMPLE LOCATION:
REPORT OF TESTS
DATE AGE LOAD
TruSTED (daYO ~ force)
10/02/1996
10/02/1996
10/23/1996
10/23/1996
7 127310
7 123680
28
28
Panel # 73
ACCUMULATIVE YARDS:
COMPR~SlVE
STRENGTH
(psi)
4500
4370
130
01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Page 2
CONCRETE COMPRE ' IVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
09/25/1996
13195000
Catellus Development Corporation
Mr. Steve Williamson
4545 Fuller Drive, Suite 100
Irving TX 75038
4747 Irving Blvd~
D~, Term 75147
Report No.: 9610381
Project No.: 43-1452-96
Project: Fritz Gateway-Warehouse
LBJ ~ Cotton & Gateway
Obtain samples of fresh concrete at the placement locations, perform required field test and east compressive
strength samples.**
comao, c'rox,,: Haws & Tingle
CONCatm'zsmU'LmR: TXI
rL~zer: 31
s'rm~: 3500 psi ~ 28 Days
SLYLY: 5" Max
HR: N/A
TZST l~aon: ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER ' MEASURED
MARKED SLUMP
SET NO. (inches)
3 1 4.0
3 2 4.0
3 3 4.0
3 4 4.0
DATE
TESTED
10/02/1996
10/02/1996
10/23/1996
10/23/1996
PROJECT DATA
coNcaz~z cr~s: 47
PL~CEMEHT DATE: 09/25/1996 ~.TCH r~sm: 6:07
~~PL~: 6:50 m BY: Roy Mo~m~.
~~ ~IONS: CI~
xau~o: 415 xI~ ~o: 670847
~R ~~ (%): N/A ~ ~xo~ ~: N/A
P~~ ~CATION: P~e~
SAMPLE LOCATION: Panel # 68
REPORT OF TESTS ACCUMULATIVEYARD8:
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(day,) 0~ force)
7 128620 4550
7 127870 4520
28
28
210
Technldan: Roy Montgomery
Report Distribution:
(1) C~llus Development Corporation
(!) Groma/zky Dupree & Associates
(1) Brockett~-Davis-Drake, Inc.
(2) Haws & Tingle
Stsrted: 3:00 am
(2) City of Coppoll
(1) Abbott Dovolopment
Finished: 9:30 am
ing, Inc.
Eugene Harbour
Vice President
OIAS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Page 3