Loading...
Gateway BP(1.2)-LR 960906CON/URETE COMPR IVE STRENGTH TES 4747 Irving Blvd~ ~ ~06 Dal[~ Tex~ 75247 Date of Service: 09/06/1996 Client No.: Client: Services: 13195000 Catdlus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 Report No.: Project No.: Project: 9609308 43-1452-96 Fritz~y-Warehouse LBJ~Comm&~y Obtain samples of flesh concrete at the placem~t locations, perform required ficld test and cast compressive strength samples.** col~rvo, croR: Haws & Tingle CONCRlgTE 8UPPLIRR: TXI l,I,~rr: 41 SF~CATION REQUIREMENTS s-rmmarrm 4000 psi ~ 28 Days SLUMP: 4" :J: 1" sm: N/A Tzs'r ME'rtIOD: ASTM C-39 ASTM C-172 ASTM C-143 · CYLINDF.~R MEASURED MARY,,RD SLUMP S~T NO. 1 1 5.5 1 2 5.5 1 3 5.5 1 4 5.5 PROJECT DATA coNcam~ CX,ASS: 47 PLACEMik-~DATE: 09/06/1996 BATCH~: 5:19 am ~E~PLEO: 5:45 am BY: Del Ratliff W]~ATtlER COlVl)ITION$: TEMPERATURE (F) - AIR ~ucK NO: 451 sm co~'mvr es): N/A Mild and cloudy 75 ~' CONCRgDz: 91 F TIC~T NO: 657870 UNIT WEIGHT .(p~: N/A Panels: 140, 141,147, 143, 117, 116, 115, 114, 104, 105. 106, 107, and 108 SAMPLE LOCATION: REPORT OF TESTS DATE AGE LOAD ~ (asy~) (n~ force) 7 115720 7 114110 28 28 09/13/1996 09/13/1996 · 10/04/1996 10/04/1996 Panel # 141 A~TIVE YARDS: 4090 4040 01AS This report is exclusively for the use of the client indicam~ above and shall not be r~at~luea~! except in full without the written approval of HBC Page I CONCRETE COMPR 31VE STRENGTH TES 4747 lr~mg Blvd., Eu~e ~ D~, Te~ 7~.47 Date of Service: Client No.: Client: Services: 09/06/1996 Report No.: 9609308 13195000 Project No.: 43-1452-96 Catellus Development Corporation Project: Fritz Gateway-Warehouse Mr. Steve Williamson LBS I~ Cotton & ~y 4545 Fuller Drive, Suite 100 Irving TX 75038 Obtain samples of fresh concrete at thc placement locations, perform required field test and cast compressive strength samples.** co~rrunCrOR: Haws & Tingle CO~CR~T~ S~PPLmR: TXI l,l,nlvr: 41 SI,~2n~CA~O~ R~Q~S STa~n'm 4000 psi ~ 28 Days SLUM~: 4" ± 1" nn~ N/A ~ M~rHOD: ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER SET NO. MEASURED SLUMP 2 1 5.0 2 2 5.0 2 3 5.0 2 4 5.0 DATE TE.qTED 09/13/1996 09/13/1996 10/04/1996 10/04/1996 PROJECT DATA co~ca~ c-~Ass: 47 PLACEMEg~DATE: 09/06/1996 BATCHTIME: 7:01 am ~t~msa~Ltn.- 7:45 am BY: Del Rafliff WRATHRR CONDITIONS: TEMI'~TURg (F) - AIR · RUCK~O: 453 nm CO~rrza~r (%): N/A P~~ ~A~ON: Overcast and cool 77 F CO~cag~g: 91 F ~C~T ~O: 657995 ul~rr w~oax 0,~0: N/A Paaels SAMPLE LOCATION: Panel # 104 REPORT OF TESTS ACCVMVL Z YARDS: MAXIMUM COMPRRgglVE AGE LOAD STRENGTH (days) Obs. ror~e) (psi) 7 106170 3750 7 109130 3860 28 28 120 I~RA~ TYPE Technician: Del Ratliff Report Distribution: (1) Catellus Development Corporation (1) Gromatzky Dupree & Assoeiat~ (1) Brockei~Davis-Drake, Inc. (2) Haws & Tingle Started: 4:30 am (2) City of Coppell (1) Abbott Development Finished: 9:00 am I'-]~~ing, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the us~ of the client indicated above and shall not be reproduced except in full without tho written approval of HBC Page 2