Gateway BP(2.1)-LR 980414 (4) Enllneerinl CU.
9200 King Adhur Drive
Dallas, Texas 75247-3610
Phone 214/631-4372 Fax 214/631-4380
April 14, 1998
TO: Mr. James T. McLaughlin PROJECT Lucent Technologies - Phase II
Catellus Development Corp. Coppell, Texas
4545 Fuller Drive, S-100 LOC^T~O~ 8" Water Line
Irving, TX 75038
REPORTNO. 16 ST Job NO. 159S-0008
RESULTS OF FIELD DENSITY TESTS
RETEST COMPACTION F!ELD ~IE:D PERCENT
TEST OF OF
DATE TEST LOCATION TEST DENSITY MOISTUPE
C~EC.=l=D
~O. TEST %0. ** PCF :'3 ~ ~ -
~;UUBE~ COt;F^C-,C.'~
Depth
148 4/2/98 - Sra. 3+50 Final 1 90.5 31.8' 92.2
149 " - Sta. 3+50 - 1' 1 89.1 33.6* 90.8*
150 " - Sta. 3+50 - 2' 1 89.3 32.5* 90.9*
TESTS PERFORMED BY: R. Mannette, C. E. T. TEST METHODS. ASTM D 2922. D 30~7. D 1556. D 2~67
O~ D 2937
~Er..IA~KS: * Indicates the moisture and/or densi~y-tdoes'.-,
....
not meet the required spec~f~catz-ons.~ ;.:.. ~-, .... -
· * Test No. 1: 98.2 pcf ~ 22.9% mozs'ture..'-~ '-'~,'..~;.~-~.
· - -
Cadence McShane .~
GDA - Scott McCreary
Ha~es ~aley - Mark Thompson
City of Coppell - Garreth Campbell