Gateway BP(1.2)-LR 960820 (2)CONCRETE COMPULSIVE STRENGTH TES'
4747 Irvin~ Blvd., ~Re #206
~ Texas 75/A7
Date of Service:
Client No.:
Client:
Services:
08/20/1996 Report No.: 9608166
13195000 Project No.: 43-1452-96
Catellus Development Corporation Project: Fritz Gateway-Warehouse
Mr. Steve Williamson LBJ (~ Cotton & Gateway
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
CONTRACTOR:
CONCRETE SUPPLIER: TXI
tLA~: 41
~PECIFICATION REQUmEMENTS
STa~: 4000 psi ~ 28 D~ys
~.~UMI': 3" - 5"
~,m: N/A
~ M~TnOD: ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER ME~RED
MARKI~ SLUMP
s~r NO. Onea.)
1 1 5.5
I 2 5.5
1 3 5.5
1 4 5.5
DATE
TESTED
08/27/1996
08/27/1996
09/17/1996
09/17/1996
PROJECT DATA
CONCRETE CLA~: 47
PLA~DATE: 08/20/1996 BATCHTI~ 2:39 am
TLMgSAMPT.~t:n: 3:15 am m~: Charlie Shurtleff
WKnTn~ CON~mONS: Partly cloudy
TEMPERATUR~O~)-AIR 75 v CoNcm~rz: 87 v
TRU~ NO: 454 ~ NO: 648460
~a ~ (~ N/A ~ ~c~ ~: N/A
P~~~A~ON: S~b~~~E&3.1~, ~F&
4~, ~d F~.9 & ~5.6
S~ ~ON: At G.7/4.2
A~X~ V~S: 20
REPORT OF TESTS
~ ~MP~
7 131740 4660
7 121850 4310
2~
2~
Technician: Charlie Shurtleff
Report Distribution:
( 1 ) Catullus Development Coq~nfion
(1) Ommatzky Dupree & Asaooiatea
(1) Bmcketto-Davi~Drake, Inc.
(2) Haws & Tingle
Started: 2:00 am
(2) City of Coppell
(l) Abbott Development
Finished: 8:00 am
I-~~, Inc.
Eugene Harbour
Vice President
01AS This relx~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
CONCRETE COMPRE0$IVE STRENGTH TES'
4747 Irvlag BIv&, ShaRe
Da~a~ Texaa 7.~47
Date of Service:
Client No.:
Client:
Services:
08/20/1996 Report No.: 9608166
13195000 Project No.: 43-1452-96
Catellus Development Corporation Project: Fritz Gateway-Warehouse
Mr. Steve Williamson LBJ ~ Cotton & Gateway
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
CONTRACTOR:
CONCRgI~ ~TPpT. mP~
~: 41
~~TION
~~: 4000 psi ~ 28 Da~
~: 3" - 5"
~: N/A
~ ~o~: ~ C-39
~ C-172
AS~ C-143
CYLINDER MEASURED
MARKED SLUMP
sgr NO. (ua~m)
2 1 5.0
2 2 5.0
2 3 5.0
2 4 5.0
DATE
T~TED
08/27/1996
08/27/1996
09/17/1996
09/17/1996
PROJECT DATA
CONCRETE CLASS: 47
ri~c~Mgavr DA~: 08/20/1996
~MZaAM~L~n: 4:15 am ~v: C~o Sh~eff
~~ ~ONS: P~y clou~
~~xu~-~ 75 v ~N~: 90
XaU~NO: 467 xI~ NO: 648477
~ ~ ~): N/A ~ ~m~ ~: N/A
P~~ ~TION: S~b on ~
SAMPLE LOCATION: At E.g/5
ACCUMUI~TIVE YARDS: 110
REPORT OF TESTS
AGE LOAD
(aaya) 0~ foreO
7 129040
7 130740
28
28
BATCHTIME: 3:50 am
4560
4620
TYPE
Technidan: Charlie Shurtleff
Report Distribution:
(1) Catellm Dovelopment Coq~n~tion
(1) Groma~y Dupr~ & Asaociat~
(1) l~x~kett~-Davia-Drake, Inc.
(2) Haws & TL~o
Started: 2:00 am
(2) City of Coppoll
(1) Abbott Development
Finished: 8:00 am
I-I~~, Inc.
Eugene Harbour
Vice President
01AS This report is exclusively for the use of~he client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
CONCRETE COMPR IVE STRENGTH TESt
4747 hwing Blvd., ~ $206
~ Texm 7~247
Date of Service:
Client No.:
Client:
Services:
08/20/1996
Report No.: 9608166
13195000
Project No.: 43-1452-96
Catellus Development Corporation Project: Fritz Cmteway-Warehouse
Mr. Steve Williamson LBJ (~ Cotton & Gateway
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of flesh concrete at the placement locations, perform required field test and east compressive
strength samples.**
CONTRACTOR:
CONCRETE ~tJPPLIER: TXI
~,i~,vr: 41
8?ECllffCATION REQUIREMENTS
s'rav_~cxm 4000 psi ~ 28 Days
,sm: N/A
xgs'r Mm~OD: ASTM C-39
ASTM C-172
ASTM C-143
CY~NDER
MARKED
SET NO.
MEASURED
SLUMP
3 1 5.5
3 2 5.5
3 3 5.5
3 4 5.5
DATE
TEST~
08/27/1996
08/27/1996
09/17/1996
09/17/1996
PROJECT DATA
co~caug~z cxu~: 47
PI~CZMm~ 9AXZ: 08/20/1996
TI~L~: 5:45 ~ ~v: C~lic Sh~eff
~TH~ ~NDmONS: P~y cloudy
T~P~ ~ - ~R 75 ~ ~N~TE: 89 F
TRU~NO: 537 ~NO: 648517
~ ~~ (%): N/A u~ ~g~ ~0: N/A
P~~ ~TIO~: S~b ~ ~de
S~P~ ~ATION: At D. 5/5.5
A~MU~ Y~S: 210
PORT OF TESTS
MAXIMUM COMPRESSIVE
AGE LOAD ~FRENGTH
~a~) (n~.fo~O (~)
7 11O62O 3910
7 119310 4220
28
28
BATCHTIME: 5:12 am
Technician: Charlie Shurtleff
Report Distribution:
(1) Catellus Development Corporation
(1) Gromatzky Dupree & Associates
(1) Brocket~-Davis-Drake, Inc.
(2) Haws & Tingle
Starte~l: 2:00 am
(2) City of Coppeff
(1) Abboa ~-volopment
Finished: 8:00 am
Eugene Harbour
Vice President
01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
-- I _ I L-. ,I ~
I I I I
!
I
I
I -- I -- ~1-- I
I
I
I
-- · I-- I -- I
I I I
II
Z
i-- 0
rt- ·
o '~'