Gateway BP(1.2)-LR 960816 (3)coNCRETE COMPRE $IVE STRENGTH TES'i
Date of Service:
Client No.:
Client:
Services:
08/16/1996
13195000
Catellus Development Corporation
Mr. Steve Williamson
4545 Fuller Drive, Suite 100
Irving TX 75038
Report No.: 9607965
Project No.: 43-1452
Project: Fritz Ga
Obtain samples of fresh concrete at the placement locations, perform require
strength samples.**
PROJECT DATA
SLUMP:
AIR:
TEST METHOD:
CONTR~OR:
CO~CRETESUVPLmR: Texas Industries, Inc.
l'La~: #31
g~ECHrICATION REQUIREMENTS
sxa~: 4000 psi ~ 28 Days
3-5"
4-6%
ASTM C-143
ASTM C-172
ASTM C-39
CYLINDER MEASU~
MARKED SLUMP DATE
~'T NO. 0n~) TESTED
~ Tex~ 7~47
-96
~way-Warehouse
2otton & Gateway
field test and east compressive
CONCP. grE crass: 8206
PLA~DATE: 08/16/1996 BATCItTIME: 4:46 am
TIM~SAM~T,~n: 5:30 am BY: ',~He Sh~
Cloudy
T~~-~ 75 · CDN~TE: 90 F
646662
~ ~ (%): 4.6% u~ ~c~ ~: 646662
P~~ ~ON: Pa~ on N ~ ofbl~. 4~'E ofW ~d of
1 1 7.0 08/23/1996 i 3950
1 2 7.0 08/23/1996 i 4220
1 3 7.0 09/13/1996 I
1 4 7.0 09/13/1996
ACCRIMULATIVE YARDS: 30
REPORT OF TESTS
AGE LOAD
(~ay~) 0~ fo~)
7 111770
7 119260
28
28
and was
Note: Contractor added water
exceeded specified limit.
notified by technician that concrete placed
01KG This report is exclusively for the use of the client indicated above and shall not b~ reproduced except in full without rite written approval of HBC En~ntm, ing. Inc.
Date of Service:
Client No.:
Client:
Services:
08/16/1996 Report No.: 9607965
13195000 Project No.: 43-1452.
Catellus Development Corporation Project: Fritz Ga
Mr. Steve Williamson LBJ (~
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of fresh concrete at thc placement locations, perform rcquil~
strength samples.**
SLUMP:
AIR:
TEST METHOD:
C~NTRACTOR:
CONC~X~Sm'PLw.~: Texas Industries, Inc.
~LSm': #31
SPEC31qCATION REQUIREMENTS
STyliSH: 4000 psi ~ 28 Days
3-5"
4--6%
ASTM C-143
ASTM C-172
CYLINDER MEASURED
MA~n SLUMP DATE
S~T No. 0ndm) TF_.ST~
2 1 7.0 08/23/1996
2 2 7.0 08/23/1996
2 3 7.0 09/13/1996
2 4 7.0 09/13/1996
PROJECT DATA
coNc~wr~ c-~.~ss: 8206
PLA~ DATE: 08/16/1996
TIME SAMPLED: 7:30am ~: C
~~ ~mo~s: CloMy
T~P~ ~ - ~ 75 r c
TRU~ NO: 542 ~
~ ~~ (~): 5.0% ~
P~~ ~ON: Pa~ on N
25' S ofN ~
S~ ~ATION:
A~~ V~S: 120
REPORT OF TESTS
0~ fo~)
7 105390
7 110510
28
28
4747 Irving Blvd., SM~ ~206
Dana**; Texas 75247
.96
~way-Warehouse
:otton & Gateway
field test and cast compressive
~ATCnXe~m: 7:02 am
harlie Shurtleff
aNCagT~: 89 v
No: 646826
WEIGHT (pc0: - -
sic~ of bldg. 550' E ofW ~nd of bldg.,
COMPRESSIVE
STRENGTH FRACTURE
(Va') TYPE
3730
3910
Technician: Charlie Shurtleff
Report Distribution:
(1) Cat~llua D~velopm~t Coq~n
(1) Btockette-Davis-Drake, Inc.
(2) Haws & T/ngl¢
01KG
Started: 4:00 am
(2) city of co~nu
(1) Abbott Development
Finished: 11:00 am
Hing, Inc.
Vice President
Th/s report is excludvely for the use of the client ind/ca/ed above and shall not be reproduced except in full without lhe nr/tten approval of HBC Eng/neer/ng, Inc.
CONCRETE COMPRE '$1VE STRENGTH TES'
Date of Service:
Client No.:
Client:
Services:
08/16/1996 Report No.: 9607965
13195000
Project No.: 43-1452
Catellus Development Corporation Project: Fritz Ga
Mr. Steve Williamson LBJ ~ t
4545 Fuller Drive, Suite 100
Irving TX 75038
Obtain samples of fresh concrete at tho placement locations, perform require
strength samples.**
~LUMP:
AIR:
TEaT METHOD:
CONTRACTOR:
CO~CaZTZSt~LtER: Texas ~es, ~c.
· ~: ~31
~CA~ON ~U~S
~~: 4000 psi ~ 28 Days
4~%
~ C-143
AS~ C-172
AS~ C-39
CYLINDER MEASURED
MARKED SLUMP DATE
~ NO. (inches) TESTED
3 1 6.5 08/23/1996
3 2 6.5 08/23/1996
3 3 6.5 09/13/1996
3 4 6.5 09/13/1996
PROJECT DATA
CONCam'~ crass: 8206
PLACFaMENT DAT~: 08/16/1996
~vm~L~n: 9:15 ~ BY: (
m~~vmo~s: Cindy
· ~TU~-~ 78 ~ c
TRU~NO: 649 ~
~~ (%): ~.1% ~
P~~ ~A~ON: Pa~ ~ ~
3Y S ofN ~
~LE ~ATION:
A~U~T~ Y~S: 210
REPORT OF TESTS
AGE ~
(~) ~ fo~O
7 116030
7 11~440
28
28
4747 Irving Blvd., Suite #206
Da~a~ Temm 75247
-96
~ay-Warehouse
2otton & Gateway
! field test and cast compressive
BATClITIM~: 8:34 am
',harlie Shurtleff
DNCRETE: 91 r
T NO: 647006
~ WEIGHT (!~0: - -
side of bldg. 620' E of W cad of bldg.,
4080
Technician: Charlie Shurtleff
Report Distribution:
(1) Catellus Developma~ Corpor~on
(1) Brocket~-Davis-Drake, Inc.
(2) Haws & Tingle
Started: 4:00 am
(2) City of Coppeli
(1) Abbott Development
Finished: l 1:00 am
~ugene Harbour
Vice President
01KG This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the Written approval of HBC Engineering, Inc.