Gateway BP(1.2)-LR 960816 (2)Date of Service:
Client No.:
Client:
Services:
4747 Irving Blv&, Suf~ #206
Dalla~ T~as 7.~247
08/16/1996
13195000
Catellus Development Corporation
Mr. Steve Williamson
4545 Fuller Drive, Suite 100
Irving TX 75038
Report No.: 9607965
Project No.: 43-1452-96
Project: Fritz Gateway-Warehouse
LBJ (~ Cotton & Gateway
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
~LUMP:
AIR:
TEST METHOD:
CONTRACTOR:
CONCRETES~rrura~: Texas Industries, Inc.
rLAWr: #31
~ECIFICATION REQUIREMENTS
STR~rH.. 4000 psi (~ 28 Days
3-5"
4-6%
ASTM C-143
ASTM C-172
ASTM C-39
CYLINDF~
SET NO,
1 1 7.0
1 2 7.0
1 3 7.0
1 4 7.0
PROJECT DATA
CONc~TE CLASS: 8206
PI~~DATIg: 08/16/1996 BAIC~V~m 4:46 am
TIMESAMPLRD: 5:30 am BY: Charlie Shurtleff
WRATHRR CONDmONS: Cloudy
TEMPERATURE (F)- AIR 75 r CONCRgng: 90 r
amUC-XNO: 484 TIC~ NO: 646662
a~R COt~rm~r (%): 4.6% ut~rr w~G~'r (~0:646662
PLACRMIR~ LOCATION: Paving on N ~idse of bldg. 490' E of W cad of
bldg., 15' $ of N curb
8~aMP~ LOCATION:
REPORT OF TESTS ACY2UM Y :
MAXIMUM COMPRgSb~E
DATE AGE LOAD ffrRF~G~I
X~STRO (~ay~) 0M foree) (t~)
08/23/1996 7 111770 3950
08/23/1996 7 119260 4220
09/13/1996 28 141470 5000
09/13/1996 28 133480 4720
30
Note: Contractor added water and was notified by technician that concrete placed
exceeded specified limit.
01KG This report is exclusively for the use of the client indicated above and shall not bo r~oduced except in full without lhe written approval of HBC Page I
CONCRETE
COMPR IVE STRENGTH
I~_dlqEi~dl~. INC.
4747 Irving BIwL,
D~ Texm 7~247
Date of Service: 08/16/1996
Client No.: 13195000
Client:
Services:
Catellus Development Corporation
Mr. Steve Williamson
4545 Fuller Drive, Suite 100
Irving TX 75038
Report No.:
Project No.:
Project:
9607965
43-1452-96
Fritz Cmteway-Warehouse
LBJ~Cotton&C-ateway
Obtain samples of flesh concrete at the placement locations, perform required field test and east compressiv~
strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR:
CO~CRZ?ZSU~PLm~: Texas Industries, Inc.
rx~r: #31
SPECIFICATION REQUIREMENTS
sr~m: 4000 psi ~ 28 Days
3-$"
4-6%
ASTM C-143
ASTM C-172
ASTM C-39
CYLINDER
MARKED
SET NO.
2 1 7.0
2 2 7.0
2 3 7.0
2 4 7.0
PROJECT DATA
CONC~U~T~ cxa~ss: 8206
PI~CRMER~DATR: 08/16/1996 RATCRTIMZ: 7:02 am
TIMESAMPI,~n: 7:30 am BY: Ch~lie Shurtlc~
w~x~x~ COmmONS: Cloudy
T~IP~TUI~09-Am 75 r ~~: 89
TRUe.O: 542 T~ so: 6~826
~ ~ (%): 5.0% ~ ~o~ ~: - -
V~~ ~ON: Pa~ on N aide ofbl~ 55~ E of W 25' S ofN c~
SAMPLE LOCATION:
REPORT OF TESTS ACCUMULAT1VEYARDS: 120
SLUMP DATE AGE LOAD $'rRl~G'l~ FRAL--'ruR~
(indm~) TESTED (day~) (lira for~e) (ira0 TYPE
08/23/1996 7 105390 3730
08/23/1996 7 1105 l0 3910
09/13/1996 28 131910 4660
09/13/1996 28 125610 4550
01KG This report is exclusively fo~ the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Page 2
CONCRETE
Date of Service: 08/16/1996
Client No.: 13195000
Client:
Services:
Catellus Development Corporation
Mr. Steve Williamson
4545 Fuller Drive, Suite 100
Irving TX 75038
Report No.:
Project No.:
Project:
4747 Ir~Jng Blvd., Suite #206
Dallas, Texas 7S3.47
9607965
43-1452-96
FfitzGateway-War~hous¢
LBJ~CotWn&Gateway
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR:
CON~E SUPPLIER: Texas Industries, Inc.
l,~rr: #31
SPECIFICATION REQUIREMENTS
s'rv.~-~t: 4000 psi (~ 28 Days
3-5"
4-6%
ASTM C-143
ASTM C-172
ASTM C-39
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
3 1 6.5
3 2 6.5
3 3 6.5
3 4 6.5
DATE
TESTED
08/23/1996
08/23/1996
09/13/1996
09/13/1996
WEATHER CONDITIONS:
TEMPERATURE (Ir). AIR
TRUCE~O: 649
Am CoAwg~rr (%): 5.1%
PROJECT DATA
CONCRETE CLASS: 8206
~'LaCmm~terDA~: 08/16/1996 BA?C~Vm: 8:34 am
TIMESAMPLRD: 9:15 am BY: Charlie Shurtleff
Cloudy
78 v CO~CRFrE: 91 V
TIC~T~O: 647006
UNIT WEIGHT (pci): - -
Paving on N side of bldg. 620' E of W end ofbldg,
35' S of N curb
SAMPLE LOCATION:
REPORT OF TESTS AC'CUM Y $:
MAXIMUM COMPREgglVE
AGE LOAD STRF2gGTH
(d~) Ob. force) (pst)
7 I 16030 41 O0
7 I 15440 4080
28 138750 4910
28 141810 5020
210
FRACrWRE
TYPE
Technician: Charlie Shurtleff
Report Distribution:
(1) Catellus Development Corporation
( 1 ) Oromalzky Duprez & Associates
(1) Brock~-Davis-Drake, Inc.
(2) Haws & Tingle
Started: 4:00 am
(2) City of Coppoll
(1) Abbott Development
Finished: 11:00 am
I--I~~ g, Inc.
Eugene Harbour
Vice President
01KG This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Page 3