Loading...
Gateway BP(1.2)-LR 960816 (2)Date of Service: Client No.: Client: Services: 4747 Irving Blv&, Suf~ #206 Dalla~ T~as 7.~247 08/16/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 Report No.: 9607965 Project No.: 43-1452-96 Project: Fritz Gateway-Warehouse LBJ (~ Cotton & Gateway Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** ~LUMP: AIR: TEST METHOD: CONTRACTOR: CONCRETES~rrura~: Texas Industries, Inc. rLAWr: #31 ~ECIFICATION REQUIREMENTS STR~rH.. 4000 psi (~ 28 Days 3-5" 4-6% ASTM C-143 ASTM C-172 ASTM C-39 CYLINDF~ SET NO, 1 1 7.0 1 2 7.0 1 3 7.0 1 4 7.0 PROJECT DATA CONc~TE CLASS: 8206 PI~~DATIg: 08/16/1996 BAIC~V~m 4:46 am TIMESAMPLRD: 5:30 am BY: Charlie Shurtleff WRATHRR CONDmONS: Cloudy TEMPERATURE (F)- AIR 75 r CONCRgng: 90 r amUC-XNO: 484 TIC~ NO: 646662 a~R COt~rm~r (%): 4.6% ut~rr w~G~'r (~0:646662 PLACRMIR~ LOCATION: Paving on N ~idse of bldg. 490' E of W cad of bldg., 15' $ of N curb 8~aMP~ LOCATION: REPORT OF TESTS ACY2UM Y : MAXIMUM COMPRgSb~E DATE AGE LOAD ffrRF~G~I X~STRO (~ay~) 0M foree) (t~) 08/23/1996 7 111770 3950 08/23/1996 7 119260 4220 09/13/1996 28 141470 5000 09/13/1996 28 133480 4720 30 Note: Contractor added water and was notified by technician that concrete placed exceeded specified limit. 01KG This report is exclusively for the use of the client indicated above and shall not bo r~oduced except in full without lhe written approval of HBC Page I CONCRETE COMPR IVE STRENGTH I~_dlqEi~dl~. INC. 4747 Irving BIwL, D~ Texm 7~247 Date of Service: 08/16/1996 Client No.: 13195000 Client: Services: Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 Report No.: Project No.: Project: 9607965 43-1452-96 Fritz Cmteway-Warehouse LBJ~Cotton&C-ateway Obtain samples of flesh concrete at the placement locations, perform required field test and east compressiv~ strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: CO~CRZ?ZSU~PLm~: Texas Industries, Inc. rx~r: #31 SPECIFICATION REQUIREMENTS sr~m: 4000 psi ~ 28 Days 3-$" 4-6% ASTM C-143 ASTM C-172 ASTM C-39 CYLINDER MARKED SET NO. 2 1 7.0 2 2 7.0 2 3 7.0 2 4 7.0 PROJECT DATA CONC~U~T~ cxa~ss: 8206 PI~CRMER~DATR: 08/16/1996 RATCRTIMZ: 7:02 am TIMESAMPI,~n: 7:30 am BY: Ch~lie Shurtlc~ w~x~x~ COmmONS: Cloudy T~IP~TUI~09-Am 75 r ~~: 89 TRUe.O: 542 T~ so: 6~826 ~ ~ (%): 5.0% ~ ~o~ ~: - - V~~ ~ON: Pa~ on N aide ofbl~ 55~ E of W 25' S ofN c~ SAMPLE LOCATION: REPORT OF TESTS ACCUMULAT1VEYARDS: 120 SLUMP DATE AGE LOAD $'rRl~G'l~ FRAL--'ruR~ (indm~) TESTED (day~) (lira for~e) (ira0 TYPE 08/23/1996 7 105390 3730 08/23/1996 7 1105 l0 3910 09/13/1996 28 131910 4660 09/13/1996 28 125610 4550 01KG This report is exclusively fo~ the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Page 2 CONCRETE Date of Service: 08/16/1996 Client No.: 13195000 Client: Services: Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 Report No.: Project No.: Project: 4747 Ir~Jng Blvd., Suite #206 Dallas, Texas 7S3.47 9607965 43-1452-96 FfitzGateway-War~hous¢ LBJ~CotWn&Gateway Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: CON~E SUPPLIER: Texas Industries, Inc. l,~rr: #31 SPECIFICATION REQUIREMENTS s'rv.~-~t: 4000 psi (~ 28 Days 3-5" 4-6% ASTM C-143 ASTM C-172 ASTM C-39 CYLINDER MARKED SET NO. MEASURED SLUMP 3 1 6.5 3 2 6.5 3 3 6.5 3 4 6.5 DATE TESTED 08/23/1996 08/23/1996 09/13/1996 09/13/1996 WEATHER CONDITIONS: TEMPERATURE (Ir). AIR TRUCE~O: 649 Am CoAwg~rr (%): 5.1% PROJECT DATA CONCRETE CLASS: 8206 ~'LaCmm~terDA~: 08/16/1996 BA?C~Vm: 8:34 am TIMESAMPLRD: 9:15 am BY: Charlie Shurtleff Cloudy 78 v CO~CRFrE: 91 V TIC~T~O: 647006 UNIT WEIGHT (pci): - - Paving on N side of bldg. 620' E of W end ofbldg, 35' S of N curb SAMPLE LOCATION: REPORT OF TESTS AC'CUM Y $: MAXIMUM COMPREgglVE AGE LOAD STRF2gGTH (d~) Ob. force) (pst) 7 I 16030 41 O0 7 I 15440 4080 28 138750 4910 28 141810 5020 210 FRACrWRE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Catellus Development Corporation ( 1 ) Oromalzky Duprez & Associates (1) Brock~-Davis-Drake, Inc. (2) Haws & Tingle Started: 4:00 am (2) City of Coppoll (1) Abbott Development Finished: 11:00 am I--I~~ g, Inc. Eugene Harbour Vice President 01KG This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Page 3