Loading...
Gateway BP(1.2)-LR 960814IN-PLACE DENSITY Date of Service: Client No.: Client: Services: 08/14/1996 82245000 Superior Utilities Arm: Bill Faust P.O. Box 543145 Dallas TX 75354 In-place density testing. Report No.: 9607845 Project No.: 43-1846-96 Project: Fritz-Crateway Storm Drain 4747 Irving Blv&, ~ ~206 ~ T~a~ 75247 co~vr~croR: Superior Utilities PROJECT DATA ~omoryT~tM~od.. ASTM D-698 Field Test Method: MOISTURE DENSITY RELATIONS: M/D No. l~crlpflon 1 Dark/Med Brown/Tan Clay 2 Dark Brown Clay Mo~ar~ % ~ p~ ASTM D-2922 ASTM D-3017 Project Requiremmt~ Mobmre Demi~y 24.3 96.3 -2/+4% 95% 26.0 95.5 -2/+4% 95% FIELD DENSITY TESTS TESY NO 518 519 52O 521 522 523 TF.~T LOCATION Subgrade, sta. 0+08, 72" RCP Subgrade, sra. 1+40, 66" RCP Subgrade, sra. 4+00, 60" RCP 1st 1L°g sm. 0+10, 72" RCP 1st lift, sm. 1+50, 66" RCP 1st lii~, sm. 4+50, 60" RCP MID MOISTURE DRY DE~ffiTY DENSITY No. (%) (pot) (% max) 1 26.0 92.8 96.4 1 25.8 93.0 96.6 1 26.4 92.3 95.8 2 27.3 92.5 96.9 2 26.9 92.8 97.2 2 26.7 93.1 97.5 East drainage Test results on this repo~ meet pr~e~ specific~ion. easement, line A, storm sewer. Technician: Jesse Landreth Report Distribution: (1) Superior Utilities (l) City of Coppell I-l~ El~Inc- Paul D. Smith, P.E. Senior Project Engineer 07CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.