Loading...
Gateway BP(1.2)-LR 960730 (2)IN-PLACE DENSITY I( STING Date of Service: Client No.: Client: Services: 07/30/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 In-place density testing. co~rrgnc'roR: Haws & Tingle MOISTUR~ DENSITY RELATIONS: M/D 1 2 3 Description Dark Brown Clay Die,Vid Bm/Tn Cly W/Red Bm Cly Tannish Brwn Sandy Clay W/CB NO TEST LOCATION 464 4th lift, grid 1460 it. n., 75 ft. e. 465 4th lift, grid 1470 ff. n., 175 ff. e. 466 4th lift, grid 1450 ft. n., 325 ft. e. 467 4th li~ grid 1460 ft. n., 440 ft. e. 468 4th lift, grid 1470 ft. n., 520 ft. e. 469 1st lift, grid E.2/5.0 470 2nd li~ grid E.2/5.0 471 1st lift, grid D.5/4.4 472 2nd li~ grid D.5/4.4 473 1st lift, grid E. 1/3.0 Report No.: 9606877 Project No.: 43-1452- Project: Fritz Gat LBJ ~ £ PROJECT DATA Laboratory Te~t Mt~od: ASTM F/eld Te~ Me~hod: ASTM ASTM Moisture % 26.0 21.0 13.0 95.5 104.0 119.5 FIELD DENSITY TESTS 4747 Irving Blvd., ~ #206 ~ Texaa 7~47 96 :way-Warehouse otton & Gateway D-698 D-2922 D-3017 M/I) MOISTURE 1~o. (%) 1 27.3 1 26.8 2 22.1 2 21.7 2 21.9 2 22.1 2 21.8 2 21.6 2 21.9 3 14.2 Project Requlrementa Moistur~ Demity · 2/+4% 95% · 2/+4% 95% 4-2% 95% DRY DF~SITY DENSITY (i~ ('/.max) 92.9 97.3 93.3 97.7 100.4 96.5 101.2 97.3 100.8 96.9 100.5 96.6 100.8 96.9 101.4 97.5 100.9 97.0 117.1 98.0 07CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. -¥ [ Report No.: 9606877 ('~., Page TEffr NO 474 2nd li~ grid E. 1/3.0 Test numbers 464 thru easement. M/D MOISTURE TEST LOCATION No. (%) 3 13.6 Test results on this report meet project specification. 468, paving area at east end along Test numbers 469 thru 474, Technician: Jesse Landreth Report Distribution: (1) Calellus Development Corporation (1) G~nnatzky Dupree & Associates (1) Brockette-Davis-Drake, Inc. (2) Haws & Tingle 4" sanitary sewer. DRY DENSITY 117.7 (2) City of Coppell (1) Abbott Development temporary d cainage DRNSlTY (% m~x) 98.5 IRC. 07CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thei written approval of HBC Engineering, Inc.