Loading...
Gateway BP(1.2)-LR 960730 (3)CONCRETE COMPREo$1VE STRENGTH TES' Date of Service: Client No.: Client: Services: 4747 Irving Blv&, Suite #206 Dallas, Texas 75247 07/30/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 Report No.: 9606859 Project No.: 43-1452-96 Project: Fritz Gateway-Warehouse LBJ ~ Cotton & Gateway Obtain samples of fresh eouerete at the placement locations, perform required field test and cast compressive strength samples.** CO~TRACTOR: CONCRETE SUPPLIER: Tgi P~uwr: 31 ~ICATION ~~~S ~OTH: 3000 psi ~ 28 Da~ ~UMP: 6" ~g: N/A ~ M~T~OO: ~ C-39 ~TM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP DATE (lneh~) T~_~YED 1 1 5.75 08/06/1996 1 2 5.75 08/06/1996 1 3 5.75 08/27/1996 1 4 5.75 08/27/1996 PROJECT DATA co~c~TE CLASS: 8220 PLnCZMZWr OATE: 07/30/1996 BATCH xxsm: 10:06 am TIME ~kI~PLF~: 11:05 am aY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUC~ NO: 478 Am cowrEm' (%): N/A PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE LOAD (day,) 0~ force) Cloudy 88 F CONCAVE: 94 F TIcg~:r NO: 634376 UNIT WEIOItT (pcO: N/A Piers: G/20, G/21, G/22, G/23, F/20, F/23, F/22, F/21 ....... E/23 Pier G/22 10 7 82180 2910 7 82170 2910 28 114060 4030 28 116820 4130 Refer to Report No. 9606858 for time. Technician: Mike Shields Report Distribution: (1) Catellus Development Corporation (1) Gromalzky Dupree & Associates (1) Brockette-Davis-Drake, Inc. (2) Haws & Tingle Started: (2) City of Coppeli (1) Abbott Development Finished: H~~ Inc. Eugene Harbour Vice President O1AS This repor~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.