Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gateway BP(1.2)-LR 960729
CONCRETE COMPREb 4IVE STRENGTH TES 4747 Irving Blvd., Suite #206 ~ Ter~ 75247 Date of Service: Client No.: Client: Services: 07/29/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 Report No.: 9606761 Project No.: 43-1452-96 Project: Fritz Gateway-Warehouse LBJ (~ Cotton & Gateway Obtain samples of fresh concrete at the plac.~mem locations, p~rform required field test and cast compressive strength samples.** CONTRACTOR: CONCRETE SUPPLIER: TXI PLn~: 31 SPECIFI~TION I~UIREMENT$ gI~OTH: 3000 psi ~ 28 Days SLUMP: 6" Am-. N/A xzgr METHOD: ASTM C-39 ASTM C-172 ASTM C-143 C~LINDER MEASURED MARKED SLUMP DATE s~r No. 0a~) TESTE~ 1 1 6.0 08/05/1996 1 2 6.0 08/05/1996 1 3 6.0 08/26/1996 1 4 6.0 08/26/1996 PROJECT DATA coNc-~x~ cnatgs: 8220 PLAC-'F. MEWrDATE: 07/29/1996 BATC~ITIME: 2:25 pm Ti~zss~: 3:10 pm BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUC~ ~O: 419 ~aa CO~rE~T (%): N/A PLACEbIENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE LOAD (~y~) 0~ for~.) Sunny and hot 97 g CONCRg~: 93 r TICKET~O: 633793 Ul~U'r wmon'r C~: N/A Piers: H/13, H/14, H/15, H]16, H]I7, H/I8, H/19, ...... Fl16 Pier H/14 10 7 71880 2540 7 73110 2590 28 102810 3640 28 98380 3480 Refer to Report No. 9606760 for time. Technician: Mike Shields Report Distribution: (!) Catellus Development Corporation (1) Gromatzky Dupr~ & Associates (1) Brock~tte-Davis-Drake, Inc. (2) Haw~ & Tingle Started: (2) City of Coppell (1) Abbott I)evelopm~ Finished: Eugene Harbour Vice President 01AS This report is exclusively for the use oflhe client indicated above and shall not be reproduced except in fi~ll without the written approval of HBC Engineering, Inc.