Loading...
WA9302-LR 960305EOTECHNICAL E GEE Consultants, Inc. E~ NVIRONMENTAL 10046 Monroe Drive * Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 GENERAL REPORT Report Date March 5, 1996 Test Date: February 21, 1996 Client City of Coppe!! General Report No.: !8 Project 6.0 MG Water Storage Tank Project No.: 95-196 Identification Cancellation Method of Test N/A Results Scheduled time: 8:00 am Type of service scheduled: Concrete Inspection Time left lab: 7:15 am Time arrived at job: 8:00 am Time left job: 8:10 am Time returned lab: 8:45 am Total Charged Time: 1.5 hrs. Reason: Cancelled upon arrival Technician: D.J./S.J. cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea