Gateway BP(2.3)-LR010217REPORTED TO:
GEC
ENVIRONMENT,a
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Gateway ~ P~ P~ ~ /
555 Dividend
Coppell, Texas
Catellus Development Corporation
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Ms. Kathy Treat
CONTRACTOR: Hill & Wilkinson, Ltd.
REPORT NO. 4
REPORT DATE
REG PROJECT
DATE OBSERV
TECHNICIAN:
PAGE: 1 of 1
TECHNICAL AND J:~ J~J I--I I I F~
L CONSULTANTS
I Items Observed:
0
: 02-17-01
NO. 7227
ED: 01-26-01
). French
Paving: 0'-255'N, 90-186'E from S.E. :orner of Bldg B.
J Reference Plans or Notes Used: J DC-1
J X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was ob
respect to the referenced portions of the contract documents.
Mail
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
(1) Hill & Wilkinson, Ltd./Mr. Jon Wright
(1) Hill & Wilkinson, Ltd./
Mr. Joe Schement
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
Submitted by:
REED ENGINEE
Odginal Signed By
James F. Phipps
BW/myw
~erved with
Extranet
Distribution:
RING GROUP, INC.
P.E.