Loading...
Gateway BP(1.2)-LR 960724IN-PLACE DENSITY STING Date of Service: Client No.: Client: Services: 07/24/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive, Suite 100 Irving TX 75038 4747 Irving Blvd., Suite #206 ~ Texaz 75247 Report No.: 9606629 Project No.: 43-1452-96 Project: Fritz Gateway-Warehouse LBJ ~ Cotton & Gateway CO~TRACTOR: Haws & Tingle PROJECT DATA Laboratory Test Method: ASTIV[ D-698 Field Test Method: MOISTURE DENSITY RELATIONS: M/D No. 1 2 ]Mazimum Description Moisture % Density pcf Tannish Brown Sandy Clay W/CB 13.0 119.5 Dk/Md Bmfrn Cly W/Rd Bm Cly 21.0 104.0 FIELD DENSITY TESTS ASTM D-2922 ASTM D-3017 Project Requirements Moisture Density ±2% 95% -2/+4% 95% TEST M/D MOISTURE DRY DENSITY DENSITY NO TEb-'r LOCATION No. (%) (pc0 (% max) 390 3rd lift, grid 975 ff. n., 140 ff. w. 1 13.8 115.5 96.7 391 3rd lift, grid 1030 ff. n., 230 ft. w. 1 14.2 115.4 96.6 392 3rd lift, grid 1100 ft. n., 170 ff. w. 1 14.5 115.0 96.2 393 3rd lift, grid 1125 ff. n., 240 ft. w. 1 14.0 115.5 96.7 394 3rd lift, grid 1175 ff. n., 160 ft. w. 1 13.6 115.8 96.9 395 3rd lift, grid 1225 ft. n. 210 ft. w. 1 13.9 115.6 96.7 396 3rd lift, grid 1300 ft. n., 170 ft. w. 1 13.5 116.2 97.2 397 3rd lift, grid 1330 ft. n., 220 ff. w. 1 14.3 115.3 96.5 398 3rd lift, grid 1200 ft. n., 275 ft. w. 1 14.7 114.7 96.0 399 3rd lift, grid 1230 ft. n., 340 ff. w. 1 14.2 115.3 96.5 400 3rd lift, grid 1175 ft. n., 380 ft. w. 1 14.1 115.4 96.6 07CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. l~eport ~qo.: 9606629 TEST NO TEST LOCATION MID MOISTURE DRY DENSITY No. (%) 1 13.6 115.9 2 20.6 101.3 2 21.2 100.6 2 21.0 100.8 2 20.4 101.6 2 20.8 101.1 2 21.0 100.9 2 20.9 I01.0 2 21.1 100.6 2 21.4 100.5 401 3rd lift, grid 1200 ft. n., 430 R. w. 402 1st lift, grid C.8/1.5, 6" storm sewer 403 2nd lift, grid C.8/1.7, 6" storm sewer 404 3rd lift, grid C.8/1.9, 6" storm sewer 405 1st lift, grid A.5/4.3, 6" sanitary sewer 406 2nd lift, grid A/4.3, 6" sanitary sewer 407 3rd lift, grid B/4.3, 6" sanitary sewer 408 1st lift, grid A. 1/4.1, 10" storm sewer 409 2nd lift, grid A. 5/4.1, 10" storm sewer 410 3rd lift, grid A. 7/4.1, 10" storm sewer Test results on this report meet project specification. Test numbers 390 thru 401, building pad. Test numbers 402 thru 410, plumbing trench. DEN~TY 97.0 97.4 96.7 96.9 97.7 97.2 97.0 97.1 96.7 96.6 Technician: Jesse Landreth Report Distribution: (1) C~llus Development Corpor~on (1) Gromatzky Dupree & Associates (1) Brockette-Davis-Drake, Inc. (2) Haws & Tingle (2) City of Colwell ( 1 ) Abbo~ Development Ht~ E~g, Inc. Paul D. Smith, P.E. Senior Project Engineer 07CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.