Loading...
WA9302-LR 960314[EOTECHNICAL E GEE Consultants, Inc. EI NVIRONMENTAL 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: March 14, 1996 Date Concrete Placed: February 15, 1996 Standard 6"x12" eliera: City of Coppell Area 28.27 Square Inches Project: 6.0 Million 6allon Water Storage Tank Concrete Report No.: 140 Contractor: Natgun Corporation Project No.: 95 -0196 Concrete Supplier and Plant. RediMix Concrete - Plant #1 Location of Placement: Radial and Circumferential Dome Joints MATERIALS source ~a~h w~. INSPECTION DATA Description (Lbs. / Cu. Yd) Mix Number: 687/Mix C Time Sample Batched: 10:01 am Cement: Time Sampled: 10:40 am Fly Ash: Sample Location: Truck/Ticket No: 163/19950 Coarse Aggregate: Temperature: httermediate Aggregate: Ambient Range: 45°F Fine Aggregate: Concrete Range: 60°F Admixtures: Slump Range (inches): 2~" Weather Conditions: Clear t Time Started: 7:30 am 2 Time Completed: 11: 15 am Added Water: 10 gal. after sampling Sample Air Content (%): 7% Total Cubic Yards Placed: 6.0 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specianen Measured Age Date Toul Load Compressire Strength Remarks Number Slump (m.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 482. 23,~" 7 09/29/96 150,920 q 240 CWT 483 2~" 28 03/14/96 183,360 6,490 CWT 484 23~" 28 03/14/96 137,580 4,870 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: G.K./A.M. l~.emarks and/or Distribution: co: Mr. Larry Davis - City of Coppell Mr. Gary Hendricks - Shimek, Jacobs and Finklea ~ Cansultants, Inc. Reviewed