Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gateway BP(1.2)-LR 960626 (4)
CONCRETE COMPRE JIVE STRENGTH TES Date of Service: 06/26/1996 Report No.: 965391 Client No.: 13195000 Project No.: 43-1452. Client: Catellus Development Corporation Project: Fritz Gal Mr. Steve Williamson LBJ 1~ ( 4545 Fuller Drive Irving TX 75038 Services: Obtain samples of fresh concrete at thc placement locations, perform requinX strength samples.** 4747 Irving Blvd., guilt #206 DaR~, Texas 75247 field test and cast compressive SLUMP: AIR: TEST METHOD: CONTRACTOR: coNcg~z S~mrLIER: Lattimore Mate~ P~: 3 ~CATION ~UI~M~S ~~: 4200 psi ~ 28 Days 3" - 4" N/A ~ C-39 ~ C-172 AS~ C-143 CYLINDER SET NO. 1 1 4.0 1 2 4.0 1 3 4.0 1 4 4.0 MEASURED SLUMP (incUeO Technician: Terry L. Smith Report Distribution: (1) Ca~llus Develolnna~t Corporation (1) Gromatzky Dupr~ & Associates (1) Brockette-Davis-Drake, Inc. (2) Haws & Tingle 01AS DATE TESTED 07/03/1996 07/03/1996 07/24/1996 07/24/1996 Started: (2) City of Coppell (1) Abbott Development This repor~ is exclusively for the use of the client indicated above and shall not be reproduoed except in full without the 7 120790 7 122580 28 28 Pinished: PROJECT DATA PLACEMENT DATR: TIMRSAMPT,~n: 3:30pm aY: ~ WEATHRR CONDITIONS: TEMPRRATUR~ Or) - AIR NAr o TRUCK NO: 608 T~CK~ ~R CoN'~rrr (%): N/A ~a~ PLACEMENT LOCATION: 6 Inch curb SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM AGE LOAD (daya) (11~. force) Station 0+~ N/A )Nm: NA F No: 3027834 ! wmo~rr (p~O: N/A l~t 4270 4330 ng, Inc. ]ugene Harbour Vice President ~-itten approval of HBC Engineering, Inc. 42 06/26/1996 2:57 pm 96 eway-Warehouse :otton & Gateway