Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gateway BP(1.2)-LR 960624
Date of Service: Client No.: Client: Services: 06/24/1996 Report No.: 965254 13195000 Project No.: 43-1452 Catellus Development Corporation Project: Fritz C~ Mr. Steve Williamson LBJ ~ 4545 Fuller Drive Irving TX 75038 Obtain samples of fresh concrete at the placement locations, perform rcquin strength samples.** SLUMP: AIR: TEaT METHOD: CONTRACTOR: CO~CRm~ strvrLmg: Latfimor¢ Materials rLA~T: 7 gPF-~21FICATION REQU~$ SrR~CTI~: 4200 psi ~ 28 Days 3" - 4" N/A ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP 1 1 4.0 1 2 4.0 1 3 4.0 1 4 4.0 DATE TESTED 07/01/1996 07/01/1996 07/22/1996 07/22/1996 PROJECT DATA CO~CRrrE CLASS: 42 P~~ DATm 06/24/1996 TIME SAMPLED: 3:15 pm BY: ~~ ~IONS: r~r~ ~ - ~ 97 r c TRUe.O: 612 ~g ~~ ('/.): N/A P~~ ~A~ON: L~ B, S~LE ~CA~ON: L~ B, A~~~ Y~S: N/A REPORT OF TESTS AGE 7 103320 7 106420 28 28 4747 Irving Blv&, ~ ~106 ~ Temm 7-n~47 .96 ~-nvay-Waxehouse ;otton & Gateway field ~ and cast compressive ~tTC-~T~M~: 2:22 pm m'yL. Smith ~NCI~TE: 90 ~o: 7022634 wr~cn-r (veO: N/A 5+96 5+96 3650 3760 Technician: Terry L. Smith Report Distribution: (1) Catellus Development Corporation ( 1 ) Gromalzky Dupree & Associates (!) Brock~Re-Davis-Drake, Inc. (2) Haws & Tingle 01AS Started: 6:30 am (2) City of Coppell (1) AbboR Development Finished: 6:30 pm H~_~g, Inc. gugene Harbour Vice President This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~n4tten approval of HBC Engineering, Inc.