Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gateway BP(1.2)-LR 960624 (2)
CONCRETE COMPRESSIVE STRENGTH TES' Date of Service: Client No.: Client: Services: 06/24/1996 Report No.: 965254 13195000 Project No.: 43-1452. Catellus Development Corporation Project: Fritz Gal Mr. Steve Williamson LBJ ~ 4545 Fuller Drive Irving TX 75038 Obtain samples of fresh concrete at the placement locations, perform require sUength samples.** SLUMP: AIR: TE~ METHOD: CONTRACTOR: CONC'R~TE SUPPLIER: L~ttimoro Materials P~: 7 ~CATION ~aru: 4200 psi ~ 28 Days 3" - 4" N/A ~ C-39 AS~ C-172 AS~ C-143 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.0 1 2 4.0 1 3 4.0 1 4 4.0 DATE TESTED 07/01/1996 07/01/1996 07/22/1996 07/22/1996 PROJECT DATA coNcam~ ctzas: 42 PLACEMENT DATE: 06/24/1996 ru~ms~a~,gn: 3:15 pm w,': '[ WEATHER CONDITIONS: TEMPERATURE (F) - AIR 97 F o TRUCK NO: 612 Tic~ ~ Co~rrz~vr (%): N/A ~ PLACEMENT LOCATION: Lille B, ~ati SAMPLE LOCATION: Line B, staff ACCUMULATIV~ YARDS: N/A REPORT OF TESTS AGE LOAD (aay~) 01~ for~) 7 103320 7 106420 28 28 4747 Irvin~ BIv&, Suite g206 Dalla~ Texas 7S247 ,96 eway-Warehouse :otton & Gateway field test and cast compressive SnTCHTnV~ 2:22 pm xryL. Smith )~caugTE: 90 F rNo: 7022634 TWEIC~r/I~: N/A ~5+96 5+96 3650 3760 Technician: Terry L. Smith Report Distribution: (1) Catellus Development Corporation ( 1 ) C, romatzky Dupr~e & Associatea (1) Brocketto-Davis-Drake, Inc. (2) Haws & Tingle Started: 6:30 am (2) City of Coppell (1) Abbott Development Finished: 6:30 pm H~~~g, Inc. Vice Pres 01AS This repofl is exclusively tbr the use of the client indicated above and shall not bo reproduced except in full without the ~ritten approval of HBC Engineering. Inc.