Gateway BP(1.2)-LR 960621 (2)CONCRETE COMPRE ,SWE STRENGTH TES'
Date of Service: 06/21/1996
Report No.: 965772
4747 Irvln~ BIv&, b%lte ~06
~ Texas 75/47
Client No.: 13195000
Project No.: 43-1452-96
Client:
Services:
Catellus Development Corporation Project: Fritz Gateway-Warehouse
Mr. Steve Williamson LBJ (~ Cotton & Gateway
4545 Fuller Drive
Irving TX 75038
Submi~f. xl Cylinders. All information other than that related to compressive strength is submitted and
asstuned to be correct.
SLUMP:
AIR:
TE~ METHOD:
CONTRACTOR:
CONCRg~ Sm'PLmR: Contractor Made
rI, n~: On-Site
S?ECnnCATXO~ mv~mamsv2ers
s-rmm~rm 0 psi (~ 0 Days
N/A
N/A
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
0nehe*) TEST~
1 1 * 06/28/1996
1 2 * 06/28/1996
! 3 * 07/!9/!996
1 4 * 07/19/1996
PROJECT DATA
PLACEMENT DATE:
~E S~P~: N/A
WEATHER CONDITIONS:
TEMPERATURE ~ - AIR
TRUCK NO: N/A
Am com'm~rr (%): N/A
PLACEMENT LOCATION:
SAMPLE LOCATION: Manhole
ACCUMULATIVE YARDS: N/A
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) Oba. fOrce)
N/A
06/21/1996 EATC~ rn~n N/A
BY: Contractor Made
NA~ Co~cax'rm NAr
TXCK~ so: N/A
vm'r wr~onT (t~: N/A
Manhole on north side ofjobaite
7 114980 4070
7 118960 4210
28 138370 4890
28 139090 4920
Note: *Contractor made cylinders
Technician: Contractor Made
Report Distribution:
( 1 ) Catullus Development Corporation
(1) Groma/zk.y Dupree & Associates
(1) Brockette-Davis-Drake, Inc.
(2) Haws & Tingle
Started:
(2) city of Coppell
(1) Abbott Developmeat
Finished:
ering, Inc.
Eugene Harbour
Vice President
01AS This repot~ is exclusively for the use of Lhe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
CONCRETE COMPRE 3IVE STRENGTH TES%
4747 Irviag Blvd., Suite #206
D~m, Texm 7~247
Date of Service: 06/20/1996 Report No.:
Client No.: 13195000 Project No.:
Client: Catellus Development Corporation Project:
Mr. Steve Williamson
4545 Fuller Drive
Irving TX 75038
Services:
965088
43-1452-96
FfitzCrateway-War~house
LBI~Cotton&Gateway
Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TE~T METHOD:
CONTRACTOR:
CONCRETE b'UPPLIRR: Latfimore Materials
ri~rr: 7
SPECIHCATION REQUIREMENTS
STgm~GTH: 4200 psi ~ 28 DaYs
3" - 4"
N/A
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inche0 TESTED
1 1 * 06/27/1996
1 2 * 06/27/1996
! 3 * 07/!8/1996
1 4 * 07/18/1996
PROJECT DATA
CONCRETe. c~.ss: 42
rLA~ DATm 06/20/1996
TIMgSn~T.~,n: N/A BY: Contractor Made
WEATHER CONDITIONS:
Tra~fl'r, aATURE09-AIR NAr C'ONCRETlt,: NAr
TRUCK NO: 460
AIR Com~vr (./.)i N/A
PLACEMENT LOCATION:
BATCHTIME: 3:29 pm
T~CK~T NO: 2022586
UNIT WEIGHT (lg'0: N/A
Utilities
SAMPLE LOCATION: Utilities
ACCUMULATIVE YARDS: N/A
REPORT OF TESTS
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(d.ys) 01~ force) (psi)
7 133460 4720
7 133690 4730
28 ;.35030 4780
28 135120 4780
Note: *Contractor made cylinders
Technician:
Report Distribution:
(1) Calellus Development Corporation
(1) Oromatz.ky Dupree & Associates
(1) Brockette-Davis-Drake, Inc.
(2) Haws & Tingle
Started:
(2) City of Coppell
( 1 ) Abbott Development
Finished:
g, Inc.
Eugene Harbour
Vice President
O1AS This report is exclusively for the use oflhe client indicated above and shall not be reproduced except in full without the written approval of HBC Engin~ring. Inc.