Gateway BP(1.2)-LR 960621 (3)CONCRETE COMPRESSIVE STRENGTH TES'!
4747 Irving Blv&, ~ #206
~ Texas 75247
Date of Service: 06/21/1996 Report No.:
Client No.: 13195000 Project No.:
Client: Catellus Development Corporation Project:
Mr. Steve Williamson
4545 Fuller Drive
Irving TX 75038
Services:
965772
43-1452;96
Fritz Gateway-Warehouse
LBl(~Cotton&Gateway
Submitted Cylinders. All information other titan that related to compressive Strength is submitled and
assumed to be correct.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR:
CONCRETE SUPI'LIER: Contractor Made
r~.~rr: On-Site
SrECnnCaTio~ REOUmEME~rS
STRENGTH: 0 psi ~ 0 Days
N/A
N/A
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER
MARKED
SET NO.
MF_~SURED
SLUMP DATE
(inches) TESTED
1 1 * 06/28/1996
1 2 * 06/28/1996
1 3 * 07/19/1996
I 4 * 07/19/1996
PROJECT DATA
CONC'~rE CLASS: N/A
r~~ DA~: 06/21/1996 ~ATC~ XZM~: N/A
TIMZ s,~n,L~n: N/A ~,': Contractor M~e
~~ ~IONS:
T~T~ ~- ~ NA F ~N~: NA F
TH~O: N/A ~ ~o: N/A
nm CO~VrgNT (%): N/A
PLACEMF, NT LOCATION:
u~rr wmoax (~0: N/A
Manhole oninorih side ofjobsite
SAMPLE LOCATION:
ACCUMUlaTIVE YARD~:
REPORT OF TESTS
AGE LOAD
(day~) ~ fore~)
Manhole
N/A
7 114980
7 118960
28
28
4070
4210
Note: *Contractor made cylinders
Technician: Contractor Made
Report Distribution:
(1) Catellus Development Corporation
(1) Oromatzky Dupree & Associates
(1) Brocketto-Davis-Drake, Inc.
(2) Haws & Tingle
Started:
(2) City of Coppeil
( 1 ) Abbott Development
Finished:
I-~ ~~g, Inc.
Eugene Ha.rbour
Vice President
01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.