Loading...
Gateway BP(1.2)-LR 960621 (3)CONCRETE COMPRESSIVE STRENGTH TES'! 4747 Irving Blv&, ~ #206 ~ Texas 75247 Date of Service: 06/21/1996 Report No.: Client No.: 13195000 Project No.: Client: Catellus Development Corporation Project: Mr. Steve Williamson 4545 Fuller Drive Irving TX 75038 Services: 965772 43-1452;96 Fritz Gateway-Warehouse LBl(~Cotton&Gateway Submitted Cylinders. All information other titan that related to compressive Strength is submitled and assumed to be correct. SLUMP: AIR: TEST METHOD: CONTRACTOR: CONCRETE SUPI'LIER: Contractor Made r~.~rr: On-Site SrECnnCaTio~ REOUmEME~rS STRENGTH: 0 psi ~ 0 Days N/A N/A ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MF_~SURED SLUMP DATE (inches) TESTED 1 1 * 06/28/1996 1 2 * 06/28/1996 1 3 * 07/19/1996 I 4 * 07/19/1996 PROJECT DATA CONC'~rE CLASS: N/A r~~ DA~: 06/21/1996 ~ATC~ XZM~: N/A TIMZ s,~n,L~n: N/A ~,': Contractor M~e ~~ ~IONS: T~T~ ~- ~ NA F ~N~: NA F TH~O: N/A ~ ~o: N/A nm CO~VrgNT (%): N/A PLACEMF, NT LOCATION: u~rr wmoax (~0: N/A Manhole oninorih side ofjobsite SAMPLE LOCATION: ACCUMUlaTIVE YARD~: REPORT OF TESTS AGE LOAD (day~) ~ fore~) Manhole N/A 7 114980 7 118960 28 28 4070 4210 Note: *Contractor made cylinders Technician: Contractor Made Report Distribution: (1) Catellus Development Corporation (1) Oromatzky Dupree & Associates (1) Brocketto-Davis-Drake, Inc. (2) Haws & Tingle Started: (2) City of Coppeil ( 1 ) Abbott Development Finished: I-~ ~~g, Inc. Eugene Ha.rbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.