Gateway BP(1.2)-LR 960620CONCRETE COMPRE $WE STRENGTH TES'
Date of Service: 06/20/1996 Report No.: 965088
4747 Irving Blvd., Suit~ #206
~ Temm 7S247
Client No.: 13195000 Project No.: 43-1452.96
Client:
Services:
Catellus Development Corporation Project: Fritz Gateway-Warehouse
Mr. Steve Williamson LBJ ~ Cotton & Gateway
4545 Fuller Drive
Irving TX 75038
Obtain samples of fresh concrete at the placement locations, perform required field test and east compressive
strength samples.**
STREHGTH:
SLUMP:
AIR:
~ METHOD:
CONTRACTOR:
CON~ stem,mm Lattimore Materials
r~,~r: 7
s~EcnncATioN av_~u~s
4200 psi ~ 28 Days
3" - 4"
N/A
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
1 1 * 06/27/1996
1 2 * 06/27/1996
1 3 * 07/18/1996
1 4 * 07/18/1996
PROJECT DATA
CONCRETIg CLAS8:
PLACEMENT DATE:
TIME SAMI'T.~n: N/A
WEATI~.R CONDmON$:
XRVCXNO.. 460
ma COm'z~r (%): N/A
PLACEMENT LOCATION:
42
06/20/1996
BY:
BATCHTIME: 3:29 pm
~.ontractor Made
NAv CONc~xr~.: NA F
TIClarr No: 2022586
~mrr wztowr (~): N/A
Utilities
SAMPLE LOCATION: Utilities
ACCUI~v~.~TIVE YARI~: N/A
REPORT OF TESTS
MAXIMUM COMPRF.,,qSIVE
AGE LOAD STRENGTH
(days) Obs. forte) (psi)
7 133460
7 133690
28
28
4720
'4730
Note: *Contractor made cylinders
Technician: Terry L. Smith
Report Distribution:
(1) Catellus Development Corporation
(1) G-romatzky Dupree & Asaociatea
(1) Brockette-Davis-Drake, Inc.
(2) Haws & Tingle
Started:
(2) City of Coppoll
(1) Abbott Development
Finished:
Eugene Harbour
Vice President
01AS This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~n approval ofHBC ~ Inc.