Loading...
Gateway BP(2.3)-LR001223REPORTED TO: GE ENVIRONMEN'I CONCRETE CYLINDER TEST REPORT Gateway One 555 Dividend Coppell, Texas Catellus Development Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Ms. Kathy Treat CONTRACTOR: Hill & Wilkinson, Ltd. Location of Sample Set Number I Location 1 Panel # 19 2 Panel # 15 REPORT REG PR( SAMPLE TECHNI( Design Information Source of Concrete Lattimore I Quantity Test Results Set Cylinder[ No. ID Date Tested 1 2508 12-30-00 2508 01-01-01 2508 01-20-01 2508 01-20-01 2508 Hold 30/205 130/205 2509 12-30-00 2509 01-01-01 2509 01-20-01 2509 01-20-01 2509 Hold 2 Cylinder Data Mix Identification 39 Specifiec Age @ I Total Load Test lbs. 7 9 28 28 H 7 9 28 28 H 102660 105830 126280 132580 101610 104750 121050 112720 Compressiw Strength p.s. 3630 3750 4470 4690 36O0 3710 4280 3990 Set Cylinder I No. I ID Slump 7 2508 5.75 2509 4.25 Time of Sample 8;53AM 10:38AM Air Temp. 42 46 Concrete Temp. 56 56 I Entra~ TECHNICAL AND I~ ~ I-'1 I I ~ AL CONSULTANTS NO. 31 )JECT NO. 7227 DATE: 12-23-00 :lAN: F. Gomez :epresented Strength p.s.i. 35OO i I Average · Strength p.s.i. 458O 4140 ,ir Ticket nment Number .2 7096664 .6 3118111 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019