Gateway BP(2.3)-LR001223REPORTED TO:
GE
ENVIRONMEN'I
CONCRETE CYLINDER TEST REPORT
Gateway One
555 Dividend
Coppell, Texas
Catellus Development Corporation
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Ms. Kathy Treat
CONTRACTOR: Hill & Wilkinson, Ltd.
Location of Sample
Set Number I Location
1 Panel # 19
2 Panel # 15
REPORT
REG PR(
SAMPLE
TECHNI(
Design Information
Source of Concrete
Lattimore
I Quantity
Test Results
Set Cylinder[
No. ID Date Tested
1 2508 12-30-00
2508 01-01-01
2508 01-20-01
2508 01-20-01
2508 Hold
30/205
130/205
2509 12-30-00
2509 01-01-01
2509 01-20-01
2509 01-20-01
2509 Hold
2
Cylinder Data
Mix Identification
39
Specifiec
Age @ I Total Load
Test lbs.
7
9
28
28
H
7
9
28
28
H
102660
105830
126280
132580
101610
104750
121050
112720
Compressiw
Strength p.s.
3630
3750
4470
4690
36O0
3710
4280
3990
Set Cylinder I
No. I ID Slump
7 2508 5.75
2509 4.25
Time of
Sample
8;53AM
10:38AM
Air Temp.
42
46
Concrete
Temp.
56
56
I Entra~
TECHNICAL AND I~ ~ I-'1 I I ~
AL CONSULTANTS
NO. 31
)JECT NO. 7227
DATE: 12-23-00
:lAN: F. Gomez
:epresented
Strength p.s.i.
35OO
i I Average
· Strength p.s.i.
458O
4140
,ir Ticket
nment Number
.2 7096664
.6 3118111
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019