Gateway BP(2.3)-LR001110 GE
ENVIRONHEN~
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Gateway One
$55 Dividend
Coppell, Texas
OTECHNICALAND J ~ F:JIJ I--1 I I ~
'AL CONSULTANTS
REPORTED TO: Catellus Development Corporation REPORT NO. 19
4545 Fuller Drive, Suite 105 REPORT DATI-': 11-10-00
Irving, Texas 75038 REG PROJECT NO. 7227
ATTN: Ms. Kathy Treat DATE OBSER~: 11-02-00
TECHNICIAN: T. Belew
CONTRACTOR: Hill & Wilkinson, Ltd. PAGE: 1 of I
/
I Items Observed: I Grade Beam: Line 1 from B to C, Linde B from 1 to 1.5
Line 1 from J to K, Line Kfrom 1 to 1.5, Line A from 17.5
to 18, Line 18 from Ato B, Line 18 fr~m H to J and Line
J from 17.5 to 18.
I Reference Plans or Notes Used: I Structural Drawings
J x JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was ol~served with
respect to the referenced portions of the contract documents.
Mail
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
(1) Hill & Wilkinson, Ltd./Mr. Jon Wright
(1) Hill & Wilkinson, Ltd./
Mr. Joe Schement
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
2424 STUTZ DR. · SUITE 400
Extranet
Distribution:
Submitted by:
REED ENGINE
Original Signed By
James F. Phipp
BW/myw
ERING GROUP, INC.
s, P.E.
· DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019