Loading...
Gateway BP(2.3)-LR001102 (2) GE, ENVIRONMENT REPORT OF PIER OBSERVATION Gateway One 555 Dividend Coppell, Texas )TECHNICAL AND ~,L CONSULTANTS REPORTED TO: CONTRACTOR: Date 10-17-00 10-18-00 Catellus Development Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 A'FI'N: Ms. Kathy Treat Hill & Wilkinson, Ltd. Pier No. D-17 D-16 D-15 D-14 D-13 D-12 E-7 E-6 E-5 E-4 E-3 E-2 G-7 G-6 G-5 G-4 G-3 G-2 K.4-8 K.5-9 K. 3-10 K-11 AA.4-11 AA. 5-10 AA. 3-9 A-8 F-10.2 JPier Diameter J Bell Diameter (inches) J (inches) I NO. REPORT DATE~ REPORT REG PROJECT TECHNICIAN: PAGE: 1 of 2 Depth Before Bell (feet) 11-02-00 NO. 7227 3. Green Final Depth of Pier (feet) 30 90 N/A 30 90 N/A 30 90 N/A 30 90 N/A 30 90 N/A 30 90 N/A 30 90 N/A 30 90 N/A 30 90 19.2 30 90 19.8 30 90 20.0 30 90 19.5 30 90 19.3 30 90 20.3 30 90 20.7 30 90 19.3 30 90 20.0 30 90 19.8 30 48 20.6 30 48 20.7 30 48 20.6 30 48 20.5 30 48 20.3 30 48 21.0 30 48 20.4 30 48 20.1 18 36 19.7 24.2 20.2 20.9 21.0 20.7 20.7 19.3 21.5 20.1 20.5 20.5 20.2 20.5 20.8 21.4 20.3 21.2 21.0 21.2 21.5 21.0 21.1 21.3 21.5 21.2 20.9 19.7 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019 REPORT NO. 9 REPORT DATE: 11-02-00 REG PROJECT NO. 7227 PAGE: 2 of 2 Date 10-18-00 Pier No. (inches) (inches) Bell (feet) F-10.5 18 36 20.0 C.7-8.6 18 36 20.6 A.5-9.3 18 48 20.1 A. 3-9.9 18 48 20.8 Our office was not aware of drilling activities until notified at 10:24 a.m. TI drilled and concreted upon arrival. Final pier depths were provided by dril Bell sizes could not be verified. Mail Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Mike Helling-Hausen (1) Hill & Wilkinson, Ltd./Mr. Jon Wright (1) Hill & Wilkinson, Ltd./ Mr. Joe Schement (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEI Original Signed By James F. Phipp= BW/mm Extmnet Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Mike Helling-Hausen Final Depth of Pier (feet) 20.0 20.8 21.3 21.0 ~ese piers were ling contractor. -'RING GROUP, INC. P.E.