Loading...
Gateway BP(2.3)-LR001019 (3)REPORTED TO: CONTRACTOR: Date 10-12-0o Mail Distribution: Extranet Distribution: GE ENVIRONMENT REPORT OF PIER OBSERVATION Gateway One 555 Dividend Coppell, Texas Catellus Devleopment Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Ms. Kathy Treat Hill & Wilkinson, Ltd. REPORT NO. REPORT DAT~: REG PROJECT TECHNICIAN: PAGE: I of 1 Pier DiameterI Bell DiameterI Depth Before Pier No. (inches) (inches) Bell (feet) A-17.5 24 66 20.2 A-17 24 66 20.3 A-16.5 24 66 20.0 G-11 24 48 20.0 H-11 24 48 20.1 J-8 24 48 20.1 H-8 24 48 20.6 C-11 24 60 20.4 B-11 24 60 20.2 E-11 24 60 20.8 F-8 24 60 20.8 D-8 24 60 20.4 C-8 24 60 20.6 F-17 30 90 20.1 F-16 30 90 20.1 F-15 30 90 20.0 F-14 30 90 20.0 F-13 30 90 20.1 F-12 30 90 20.7 (1) Catellus Devleopment Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Mike Helling-Hausen (1) HiLl & Wilkinson, Ltd./Mr. Jon Wright (1) Hill & Wilkinson, Ltd./ Mr. Joe Schement (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Catellus Devleopment Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Mike Helling-Hausen Submitted by: REED ENGINE Original Signed By James F. Phipl: BW/mm :)TECHNICAL AND AL CONSULTANTS 10-19-00 NO. 7227 3. Green Final Depth of Pier (feet) 20.3 20.3 20.4 20.4 20.5 20.5 20.9 20.7 20.8 20.8 20.8 20.8 20.8 20.8 20.4 20.1 20.1 20.8 20.9 ERING GROUP, INC. s, P.E. 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019