Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
WA9302-LR 960307 (4)
[EOTEC] HNICAL E GEE Consultants, Inc. E~ NVIRONMENTAL 10046 Monroe Drive * Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION l~cport Date: March 7, 1996 Date Concrete l'laced: February 21, 1996 Standard 6"x 12" Client: City of Coppell Area 28.27 Square h~ches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 143 Contractor: Natgun Corporation Project No.: 95 -0196 Concrele Supplier and Plan|: RediMix Concrete - Plant//1 Location of Placement: Wall Slots MATERIALS s ....../ .,,,d. w,~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 689/]Mix F Time Sample Batebed: 11:00 am Cement: Time Sampled: 11:30 am Sample Location: //23-30 Fly Ash: Truck/Ticket No: 147/10382 Coarse Aggregate: Temperature: hltermcdiate Aggregate: Ambient Range: 93°F Fine Aggregate: Concrete Range: 80°F Slump Range (inches): 7 %" .A dmixlures: Weather Conditions: Clear I Time Started: 10:30 mn 2 Time Completed: 4:15 am Added Water: 20 gal. Sample Air Content (%): 4.5% Total Cubic Yards Placed: 5.0 C.Y. Required Slrenglh (Lbs./sq.in.): 5,000 psi Specimen Measured Age Dale '['l~lal I,oad Compresslye Streng~ Realarks Nunflier Slulnp (i,i.) (I)ays) 'l'eslcd (I.bs.) (Lbs./Sq.hl.) CWT 491 7 V2" 7 02/28/96 167,600 5,930 CWT 492 7 %" 28 03/20/96 CWT 493 7 V," 28 03/20/96 I'cst Methods Ulilizcd I:rachlre leegular ASIhl C 31,(7 39,C-143 (Unless Noted Otherwise} Cylinders Made By: D.J ./S.J. b~eluarks and/or Dislribttlion: Slunq~ was ~A" before super added. c{:: Mr. Larry Davis - City of Copl~ell Mr. Gal3' ltendricks * Shimek, Jacobs and Finklea