Gateway BP(1.2)-LR 960620 (3)CONCRETE COMPRE .$1VE STRENGTH TES'.
4747 lrvln~ Blvd., Suite #206
~ Teama 7.~g47
Date of Service:
Client No.:
Client:
Services:
06/20/1996
13195000
Catellus Development Corporation
Mr. Steve Williamson
4545 Fuller Drive
Irving TX 75038
Report No.: 965088
Project No.: 43-1452-96
Project: Fritz ~y-Warchouse
LBJ (~ Cottcm & Crateway
Obtain samples of freah concrete at the placaneat locations, perform required field te~t and cast compre~ve
strength samples.**
SLUMP:
AIR:
TF, KF METHOD:
CONTRACTOR:
CONC-~U~TE SVPPLmR: Lattimore Materials
l,I~vr: 7
SPECIFICATION REQUIREMENTS
sra~TH.. 4200 psi ~ 28 Days
3" - 4"
N/A
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
1 1 * 06/27/1996
1 2 * 06/27/1996
1 3 * 07/18/1996
1 4 * 07/18/1996
PROJECT DATA
CON~E C-Xa~: 42
r~c~m~ DATE: 06/20/1996
rIM~SAM~L~n: N/A se: Contractor Made
WEATI~R CONDITIONS:
X~gl~Og-Sag NA F coNcsm'g: NA F
TgVCXNO: 460 TICX~r NO: 2022586
Am coNTr~rr (%): N/A um'rw~o~r(ve0: N/A
P~~ ~A~ON: U~
SAMPLE LOCATION: Utilities
ACCUMULATIVE YARDS: N/A
REPORT OF TESTS
AGE LOAD
(aay~) 0~. for~)
7 133460
7 133690
28
28
anXC~ ~ 3:29 pm
4720
'4730
Note: *Contractor made cylinders
Technician: Terry L. Smith
Report Distribution:
(1) Catellus Development Corpo~tion
(1) Oromatzky Dupree & Associates
(I) Brockette-Davis-Drake, Inc.
(2) Haws & Tingle
Started:
(2) City of Coppell
(1) Abbott Development
Finished:
H~ En ' rmg, Inc.
Vice Preaident
01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.