Loading...
Gateway BP(1.2)-LR 960620 (3)CONCRETE COMPRE .$1VE STRENGTH TES'. 4747 lrvln~ Blvd., Suite #206 ~ Teama 7.~g47 Date of Service: Client No.: Client: Services: 06/20/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive Irving TX 75038 Report No.: 965088 Project No.: 43-1452-96 Project: Fritz ~y-Warchouse LBJ (~ Cottcm & Crateway Obtain samples of freah concrete at the placaneat locations, perform required field te~t and cast compre~ve strength samples.** SLUMP: AIR: TF, KF METHOD: CONTRACTOR: CONC-~U~TE SVPPLmR: Lattimore Materials l,I~vr: 7 SPECIFICATION REQUIREMENTS sra~TH.. 4200 psi ~ 28 Days 3" - 4" N/A ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP DATE 1 1 * 06/27/1996 1 2 * 06/27/1996 1 3 * 07/18/1996 1 4 * 07/18/1996 PROJECT DATA CON~E C-Xa~: 42 r~c~m~ DATE: 06/20/1996 rIM~SAM~L~n: N/A se: Contractor Made WEATI~R CONDITIONS: X~gl~Og-Sag NA F coNcsm'g: NA F TgVCXNO: 460 TICX~r NO: 2022586 Am coNTr~rr (%): N/A um'rw~o~r(ve0: N/A P~~ ~A~ON: U~ SAMPLE LOCATION: Utilities ACCUMULATIVE YARDS: N/A REPORT OF TESTS AGE LOAD (aay~) 0~. for~) 7 133460 7 133690 28 28 anXC~ ~ 3:29 pm 4720 '4730 Note: *Contractor made cylinders Technician: Terry L. Smith Report Distribution: (1) Catellus Development Corpo~tion (1) Oromatzky Dupree & Associates (I) Brockette-Davis-Drake, Inc. (2) Haws & Tingle Started: (2) City of Coppell (1) Abbott Development Finished: H~ En ' rmg, Inc. Vice Preaident 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.