Gateway BP(1.2)-LR 960618 (4)CONCRETE COMPR S E STRENGTH TES
Date of Service: 06/18/1996 Report No.: 965094
4747 ~ Blvd.,
~ T~xa~
Client No.: 13195000 Project No.: 43-1452.96
Client:
Services:
Catellus Development Corporation Project: Fritz Gateway-Warehouse
Mr. Steve Williamson LBJ ~ Cotton 8: ~y
4545 Fuller Drive
Irving TX 75038
Submitted Cylinders. All information other than that related to compressive strength is su~ and
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR:
CONCR~rg St~UZR: Contractor Made
~I~rr: On-Site
SPECIFICATION REQUIREMENTS
Srl~Ora: 4200 psi ~ 28 Days
2" - 3"
N/A
ASTM C-39
ASTM C-172
ASTM Co143
CYLINDER
M~m~ED
SET NO.
MEASURED
SLUMP DATE
1 1 * 06/25/1996
1 2 * 06/25/1996
1 3 * 07/16/1996
1 4 * 07/16/1996
Note: *Contractor made cylinders
PROJECT DATA
CONC~TZ c-xa~: N/A
eL~CE~E~r DAT~: 06/18/1996 ~T~: N/A
T~~L~n: N/A ~: ~~rM~
~~ ~ND~ONS:
~P~TU~ ~ - ~ NAg ~N~: NAg
TRUCK NO: N/A
Am CONTmVr (%): N/A
PLACEMENT LOCATION:
TIC~TNO: N/A
U~T wno~r ~0: N/A
SAMPLE LOCATION:
AC'CUMUI~TIV~ YARDS:
REPORT OF TESTS
AGE LOAD
(~y~) (1~ ron~)
7 110010
7 102730
28
28
Manholes
N/A
3890
3630
TYPE
Teclmidan: Contractor Made
Report Distribution:
( 1 ) C~tellus Development Co~oration
(1) Gromatzky Duproe & Associates
(I) Brockette-Davis-Drake, Inc.
(2) I~ws & Tingle
Started:
(2) City of Coppell
(~) Abbott Oe~opm~t
Finished:
eering, Inc.
Eugene Harbour
Vice President
01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.