Loading...
Gateway BP(1.2)-LR 960618 (4)CONCRETE COMPR S E STRENGTH TES Date of Service: 06/18/1996 Report No.: 965094 4747 ~ Blvd., ~ T~xa~ Client No.: 13195000 Project No.: 43-1452.96 Client: Services: Catellus Development Corporation Project: Fritz Gateway-Warehouse Mr. Steve Williamson LBJ ~ Cotton 8: ~y 4545 Fuller Drive Irving TX 75038 Submitted Cylinders. All information other than that related to compressive strength is su~ and SLUMP: AIR: TEST METHOD: CONTRACTOR: CONCR~rg St~UZR: Contractor Made ~I~rr: On-Site SPECIFICATION REQUIREMENTS Srl~Ora: 4200 psi ~ 28 Days 2" - 3" N/A ASTM C-39 ASTM C-172 ASTM Co143 CYLINDER M~m~ED SET NO. MEASURED SLUMP DATE 1 1 * 06/25/1996 1 2 * 06/25/1996 1 3 * 07/16/1996 1 4 * 07/16/1996 Note: *Contractor made cylinders PROJECT DATA CONC~TZ c-xa~: N/A eL~CE~E~r DAT~: 06/18/1996 ~T~: N/A T~~L~n: N/A ~: ~~rM~ ~~ ~ND~ONS: ~P~TU~ ~ - ~ NAg ~N~: NAg TRUCK NO: N/A Am CONTmVr (%): N/A PLACEMENT LOCATION: TIC~TNO: N/A U~T wno~r ~0: N/A SAMPLE LOCATION: AC'CUMUI~TIV~ YARDS: REPORT OF TESTS AGE LOAD (~y~) (1~ ron~) 7 110010 7 102730 28 28 Manholes N/A 3890 3630 TYPE Teclmidan: Contractor Made Report Distribution: ( 1 ) C~tellus Development Co~oration (1) Gromatzky Duproe & Associates (I) Brockette-Davis-Drake, Inc. (2) I~ws & Tingle Started: (2) City of Coppell (~) Abbott Oe~opm~t Finished: eering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.