Loading...
Gateway BP(1.2)-LR 960613 (2)cONCRETE COMPREf' . IVE STRENGTH TES Date of Service: 06/13/1996 Report No.: 964801 Client No.: 13195000 Project No.: 43-1452 Client: Catdlus Development Corporation Project: Fritz Cr~ Mr. Steve W'~ LBJ ~ ( 4545 Fuller Drive Irving TX 75038 Service~: Obtain sampl~ of fre~ concrete ~t the placement location~, perform require ~ mup1~.** 5LUMP: AIR: ~ METHOD: ~OI~RACTOR: I'LAt~: 7 81~'~IFICATION RF~~S ~~: 4200 psi ~ 28 Da~ 3" 4 - 6% ~ C-39 ~ C-172 ~ C-143 CYLINDER MEA~RED MARKED SLUMP sgr ~o. 0n~) 1 1 1.5 1 2 1.5 1 3 1.5 1 4 1.5 PRO3ECT DATA coNcau~ cl~.ss: 42 ~'~,~CaMm~ Da~: 06/13/1996 ~~.~n: 3:05 pm ~R ~ONS: x~~-~ 92 ~ c TRU~ NO: 612 ~ ~ ~): N/A P~~ ~TION: ~le, ~ ~ON: No~ ~~~Y~S: N/A PORT OF TESTS DATE AGE LOAD TSST~ (d~y0 0~. fore,) 06/20/1996 06/20/1996 07/11/1996 07/11/1996 7 136410 7 128690 28 151350 28 148040 Technldan: Eugene Haxbour Report Distribution: (1) Catollus D~volopment Corporation (1) Gromatzky Dupreo & Azaociatez (1) BrockeCte-Davis-Drake, Inc. (2) Haws & Tingle Started: 2:30 pm (2) city of Cop~ll (!) Abbott Development Finished: 4:00 pm I'~ 01AS This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the 4747 Ir'vial Blvd., Suite #206 D*n**~ Texa~ 75247 -96 ~nty-Warchouse ~tton & ~y field test and cast compressive an?c~rn~ 2:25 pm ,us n Harbour ,'r ~o: 7022414 rr w~uGa, r (~0: N/A a of project 4820 4550 5350 5240 g, Inc. Eugene Harbour Vice President written approval ofHBC ~g, In~. COI CRETE COMPRE IVE STRENGTH TES'J, Date of Service: Client No.: Client: Services: 06/18/1996 13195000 Catdlus Development Corporation Mr. Steve Williamson 4545 Fuller Drive Irving TX 75038 Report No.: 965094 Project No.: 43-1452- Project: Fritz Ga~ Lm® c Submitted Cylinders. All information other than that related to compressive assumed to be cone~t. SLUMP: AIR: TRsr METHOD: CON.gTE st~P~m~: Comraetor Made rs~unT: On-Site ~CA~ON ~~S ~~: 42~ psi ~ 28 Days 2" - 3" N/A ~ C-39 ~ C-172 ~ C-143 CYLINDER MARKED NO. M~ SLUMP DATE (inches) TESTED 1 1 * 06/25/1996 1 2 * 06/25/1996 ! 3 * 07/16/1996 I 4 * 07/16/1996 PROJECT DATA cONCam~ c-n_,Ass: N/A Pt.nC-~Mmer DATm 06/18/1996 T~ S~LRD: N/A BY: ~T~ ~ONS: T~T~ ~ - ~ NA ~ TRU~ NO: N/A ~ ~ ~ C/.): N/A ~ P~~ ~ON: ~o1~ S~ ~ON: ~oles .~~T~ Y~S: N/A REPORT OF TESTS AGE LOAD (days) 0~ forgo 7 110010 7 102730 28 125580 28 125820 Note: *Contractor made cylinders 4747 h-ring Bi~d~ ~ #206 l~n~-, T~ 75247 96 eway-Warehouse :otton& Cmteway BATCIt TIME: N/A ;ontractor Mad~ )NC-aZ'm: NAv r NO: N/A r WEIGIIT (!.:1): N/A E~MPRESSIVE STRENGTH 3890 3630 4440 4450 Technician: Contractor Made Report Distribution: (1) Ca.tellus Development Coq~oration ( I ) Oromatzky Dupr~o & Associates (1) Brocket~e-Dav/s-Drake, Inc. (2) Haws & Tingle 01AS Started: (2) City of Copp~ll (1) Abbott Development Finished: a~~nc Eugene Harbour Vice President This report is exclusively tbr the use of the client indicated above and shall uot be reproduced except in thll without the written approval of HBC Engineering, Inc.