Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gateway BP(1.2)-LR 960613 (3)
'IN-PLACE DENSITY STING Date of Service: Client No.: Client: Services: 06/13/1996 13195000 Catellus Development Corporation Mr. Steve Williamson 4545 Fuller Drive Irving TX 75038 co~vraAcrrom Haws & Tingle Mo/KruRE DENSITY RELATIONS: M/D No, Description 1 Dark Brown Clay 2 Dark/Mcdium Brown/Tan Clay Report No.: 964821 Project No.: 43-1452 Project: Fritz Ga Lm@ PROJECT DATA Field Te~t Method: Mobture % 26.0 24.3 Mttlmum 95.5 96.3 FIELD DENSITY TESTS TR,~r M/D MOISTURE NO TEST IX)CATION No. (%) 21 1st liR, sta. 0+60 2 26.9 22 2nd lift, sm. 0+65 2 26.7 23 3rd ~ sra. 0+90 2 26.3 24 4th lift, sta. 1+00 2 26.5 25 5th liR, sra. 1+70 1 27.5 26 6th li~ sra. 1+80 1 27.2 27 1st lift, sra. 0+25 2 27.2 28 2nd liR, sta. 0+28 2 26.9 29 3rd li~ sta. 0+30 2 26.8 30 4th liR, sta. 0+35 1 27.2 31 1st lift, sra. 0+60 2 26.5 07CC 4747 Irving Blvd., Suite #2(~ Dallas. Texa~ 752.47 -96 ~eway-Warehouse 2otton & Gateway D-698 , D-2922 D-3017 Prolect Req~ireme~ -2/+4% 95% -2/+4% 95% This repo~ is exclusively for the use of~he client indicated above and shall not be reproduced except in full wiLhout th, DRY DENSITY DENSITY (p'-'O (% max) 93.4 97.0 93.7 97.3 94.1 97.7 93.9 97.5 93.2 97.6 93.6 98.0 94.2 97.8 93.5 97.1 93.8 97.4 93.5 97.9 94.0 97.6 written approval ofHBC Engineedng, ]nc. Report No.: 964821 TEST NO 32 2nd lif~ sm. 0+63 33 3rd lif~, sta. 0+65 34 4th lil%, sta. 0+75 35 5th liR, sta. 0+78 36 6th lift, sta. 0+80 37 7th lil%, sta. 1+00 38 8th li~ sta. 1+05 39 1st li~ sra. 0+70 40 2nd lif~, sta. 0+75 41 3rd lift, sta. 0+90 42 4th lift, sra. 0+95 Test numbers 21 Test numbers 27 Test numbers 31 Test numbers 39 Page 2 TEST LOCATION M/D MOISTURE ~o. (%) 2 26.8 2 26.5 2 26.5 2 26.3 1 27.1 1 27.0 1 26.8 2 26.3 2 26.6 2 26.5 2 26.3 DRY DENSITY 93.5 94.1 94.0 94.4 93.7 93.9 94.1 94.4 94.0 94.2 94.5 Test results on this repo~ meet pr~e~ specification. through 26, 8" sanitary sewer - line D. through 30, 8" sanitary sewer - line C. through 38, 6" sanitary sewer - line C. through 42, 18" RCP - line A-5. DENsr~Y 97.1 97.7 97.6 98.0 98.1 98.3 98.5 98.0 97.6 97.8 98.1 Technician: Jesse Landreth Report Distribution: ( 1 ) Catellus Development Corporation (1) Caxmmt~y Dupree & ~ (1) Bro~k~t~-Davis-Drake, In~ (2) Hav~ & Tinglo 07CC (2) City of Coppell ( 1 ) Abbott Development This report is exclusively for the use of the client indicated above and shall not be reproduc~t oxcep~ in full without the I-l~ E~ Inc. Pitul D. Smith, P.E. S~ nior Project Engineer written approwl ofHBC Engin~fing. Inc.