Loading...
Gateway BP(1.2)-LR 960613 (4)CONCRETE COMPREo SIVE STRENGTH TES'x ' 4747 Irving Blv&, ~ite//206 Dalla% Texa~ 75247 Date of Service: Client No.: Client: Services: 06/13/1996 13195000 Catellus Development Corporation Mr. Steve Bryan 4545 Fuller Drive Irving TX 75038 Report No.: 964801 Project No.: 43-1452-96 Project: Fritz Crateway-Warehousc LBJ ~ Cotton & Gateway Obtain samples of fresh concrete at the placement locations, perform requir~ field test and cast compressiw strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: CONCRETE SUPPLIER: Lattimore Materials ~,~rr: 7 SPECIFICATION REQUIREMENTS STRengtH: 4200 psi ~ 28 Days 3** 4 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP 1 1 1.5 1 2 1.5 1 3 1.5 1 4 1.5 DATE TESTED 06/20/1996 06/20/1996 07/11/1996 07/11/1996 PROJECT DATA PLACEMENT DATE: TIME SAMPLED: 3:05 pm WEATHER CONDITIONS: T~Pm~AXtU~ 09- AIR 92 TR~CK ~O: 612 nm CONTr, NT e/.): N/A PLACEMENT LOCAI'ION: 42 06/13/1996 BATCHTIME: 2:25 pm BY: Eugene Harbour F CONCRETE: 88 F TIctcET ~o: 7022414 UNIT WEIGHT (pc/): N/A Manhole, end of project SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE LOAD (d=y~) 0~. 7 136410 7 128690 28 28 North and south manholes N/A COMP~ STRENGTH 4820 4550 TYPE Technician: Eugene Harbour Report Distribution: (i) Catellus Development Corporation (!) Gromatzky Dupree & Associates (!) Broekette-Davis-Drake, [ne. (2) Haws & Tingle Started: (2) City of Coppell 2:30 pm Finished: 4:00 pm H~~ng, Inc. Euugene Harbour Vice President OIAS This report is exclnsively ilar the use of the client indicated above and shall not be reproduced except in flail xvithout the written approval of HBC Engineering [nc, CONCRETE COMPRE ,SIVE STRENGTH TES · 4747 Irving BIv&, ~uRe Dall~ Te~s 7~47 Date of Service: Client No.: Client: Services: 06/13/1996 Report No.: 964801 13195000 Project No.: 43-1452-96 Catellus Development Corporation Project: Fritz Gateway-Warehouse Mr. Steve Bryan LBJ ~ Cotton & Gateway 4545 Fullor Drive hying TX 75038 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TF_~T METHOD: CONCaETE SUePLmR: Lattimore Materials Pl_~u,r: 7 SP~.CIFICATION nr_Oumm~m, rs srg~NarH: 4200 psi ~ 28 Days 3" 4 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. 1 1 1.5 1 2 1.5 1 3 1.5 I 4 1.5 DATE TESTED 06/20/1996 06/20/1996 07/I 1/1996 07/I 1/1996 PROJECT DATA PLACEMENT DATE: TIME SAMPLED: 3:05 pm WEATHER CON'I)ITIONS: TEMPERATURE (F) - AIR 92 TRUCaC NO: 612 Am CONT~.NT (%): N/A PLACEMENT LOCATION: Manhole, end of project SAMPLE LOCATION: lqo~d~ and south manholes ACCUMULArr,~z Yam>s: N/A REPORT OF TESTS AGE LOAD 7 136410 4820 7 128690 4550 28 28 42 06/13/1996 BATCHTIME: 2:25 pm BY: Eugene Harbour F CONCRETE: 8 8 F TmaC~ NO: 7022414 UNIT WEIOI~I' (Pc0: N/A COMPRESSIVE STRENGTH TYPE Technician: Eugene Harbour Report Distribution: (I) Catellus Development Corporation (1) Crromatzky Dupree & Associates (I) Brockette-Davis-Drake, Inc. (2) Itaws & Tingle Started: (2) City of Coppell 2:30 pm Finished: 4:00 pm H~E~ng, Inc. L~ugene Harbour Vice President 01AS This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in lhll without the written approval of HBC Engineering, Inc.