Gateway BP(1.2)-LR 960606Date of Service: 06/06/1996 Report No.:
Client No.: 13195000 Project No.:
Client: Catellus Development Corporation Project:
Mr. Steve Bryan
4545 Fuller Drive
Irving TX 75038
Services:
964551
43-1452
Fritz Ga
LB] ~
Submitted Cylinders. All information other than that related to compressive
assumed to be correct.
SLUMP:
AIR:
TEST METHOD:
cot~Acroa: Haws & Tingle
CONCRETE SUPPLIER: Contractor Made
~PECIFICATION REQUIREMENTS
s~i~_~oTit: 4200 psi ~ 28 Days
N/A
N/A
ASTM C-39
ASTM C-172
ASTM C- 143
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
(inche~) TESTED
1 1 * 06/13/1996
1 2 * 06/13/1996
1 3 * 07/04/1996
1 4 * 07/04/1996
PROJECT DATA
CO~CamTE CLASS: N/A
PLAC~MEWr DATE: 06/06/1996
TIME SAMPLED: N/A BY:
WEATHER CONDITIONS:
TEMPERATURE Or) - AIR NAr
TRUCK NO: N/A TICKI
~IR com~r (%): N/A uN
PLACEMENT LOCATION: Line A-l, 3~
SAMPLE LOCATION: Line A-1 at
ACCUMULATIVE YARDS: N/A
REPORT OF TESTS
MAXIMUM
AGE LOAD
(aay0 0~. for~e)
7 105300
7 103750
28
28
Note: *Contractor made cylinders.
4747 Irving Blvd., Suite #206
Dalla% Texa~ 7.~147
-96
teway-Waxehouse
2otton & Gateway
strength is submitted and
SATC~t TIMm N/A
2ontractor Made
ONCRETE: NA F
,?NO: N/A
rr wm(m-r (pc0: N/A
inch RCP inlet
~tion 2+44
COMPRESSIVE
STRENGTH FRACTURE
3720
3670
Technician: Contractor Made
Report Distribution:
(1) Catellus Development Corporation
(I) Gromatzky Dupree & Associates
(I) Brockette-Davis-Drake, Inc.
(2) Haxvs & Tingle
Started:
(2) City of Coppell
Finished:
01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in thll without the
Eugene Harbour
Vice President
written approval of HBC Engineering, Inc: