Gateway BP(1.2)-LR 960606 (2)Date of Service: 06/06/1996
Report No.: 964551
Client No.: 13195000 Project No.: 43-1452
Client: Catellus Development Corporation
Services:
Project: Fritz Ga
Mr. Steve Williamson LBJ ~
4545 Fuller Drive
Irving TX 75038
Submitted Cylinders. All information other than that related to compressive
assumed to be correct.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
cowrv, ncroR: Haws & Tingle
CO~C~T~ stwPLXm~: Contractor Made
I'LAI~: On-Site
SPECIFICATION REQUIREMRNT$
4200 psi ~ 28 Days
N/A
N/A
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
(inches) TESTED
1 1 * 06/13/1996
1 2 * 06/13/1996
1 3 * 07/04/1996
1 4 * 07/04/1996
PROJECT DATA
co~ca~'I~ ~: N/A
P~cmvm~ DA~m: 06/06/1996
TIMIt, SAMPLED: N/A aY:
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR NAr
TRUCK NO: N/A
Am CON'rr~rr (%): N/A
PLACEMENT LOCATION:
SAMPLE LOCATION:
ACCUMULATIVE YARDS:
REPORT OF TESTS
UN
Line A-l, 31
Line A-1 at
N/A
MAXIMUM
AGE LOAD
(day,) ~ force)
7 105300
7 103750
28 133890
28 138580
Note: *Contractor made cylinders.
Technician: Contractor Made
Report Distribution:
(1) Cat~lus Development Corporation
(1) Oromalzky Dupree & Associates
(1) Broeketl~-Davis-Drake, Inc.
(2) Haws & Tingle
Started:
(2) City of Coppell
(l) Abbott Development
Finished:
01,4,8 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without th~
4747 Irving Blvd., Suite #206
Dallas; Texan 75247
-96
teway-Warehouse
2otton & Gateway
BATCHTIME: N/A
2ontraetorMade
oNcam~: NA ~'
,xNo: N/A
IT WEIGIff (1~t): N/A
in~ RCP ial~t
~tion 2+44
COMPRESSIVE
STRF_~GTH
3720
3670
4730
4900
Inc.
~ugene Harbour
Vice President
z~rit~ approval of HBC Engineering, Inc.