Loading...
Gateway BP(1.2)-LR 960606 (2)Date of Service: 06/06/1996 Report No.: 964551 Client No.: 13195000 Project No.: 43-1452 Client: Catellus Development Corporation Services: Project: Fritz Ga Mr. Steve Williamson LBJ ~ 4545 Fuller Drive Irving TX 75038 Submitted Cylinders. All information other than that related to compressive assumed to be correct. STRENGTH: SLUMP: AIR: TEST METHOD: cowrv, ncroR: Haws & Tingle CO~C~T~ stwPLXm~: Contractor Made I'LAI~: On-Site SPECIFICATION REQUIREMRNT$ 4200 psi ~ 28 Days N/A N/A ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED 1 1 * 06/13/1996 1 2 * 06/13/1996 1 3 * 07/04/1996 1 4 * 07/04/1996 PROJECT DATA co~ca~'I~ ~: N/A P~cmvm~ DA~m: 06/06/1996 TIMIt, SAMPLED: N/A aY: WEATHER CONDITIONS: TEMPERATURE (F) - AIR NAr TRUCK NO: N/A Am CON'rr~rr (%): N/A PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS UN Line A-l, 31 Line A-1 at N/A MAXIMUM AGE LOAD (day,) ~ force) 7 105300 7 103750 28 133890 28 138580 Note: *Contractor made cylinders. Technician: Contractor Made Report Distribution: (1) Cat~lus Development Corporation (1) Oromalzky Dupree & Associates (1) Broeketl~-Davis-Drake, Inc. (2) Haws & Tingle Started: (2) City of Coppell (l) Abbott Development Finished: 01,4,8 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without th~ 4747 Irving Blvd., Suite #206 Dallas; Texan 75247 -96 teway-Warehouse 2otton & Gateway BATCHTIME: N/A 2ontraetorMade oNcam~: NA ~' ,xNo: N/A IT WEIGIff (1~t): N/A in~ RCP ial~t ~tion 2+44 COMPRESSIVE STRF_~GTH 3720 3670 4730 4900 Inc. ~ugene Harbour Vice President z~rit~ approval of HBC Engineering, Inc.