Loading...
Gateway BP(1.2)-LR 960605IN-PLACE DENSITY T ESTING Date of Service: 06/05/1996 Client No.: 13195000 Client: Services: Catellus Development Corporation Mr. Steve Bryan 4545 Fuller Drive Irving TX 75038 CONTRACTOR: HaW~ ~ Tingle MOISTURE DENSITY RELATIONS: MID No. Description 1 963430 Dark Brown Clay TEgr NO TEST LOCATION 1 1st lift, sta. 1+00 2 2nd lift, sta. 1+35 3. 1st lift, sra. 3+70 4 2nd lifk, sta. 3+90 5 1st liR, sta. 0+80 6 2nd liR, sta. 0+90 Report No.: 96444~ Project No.: 43-145 Project: Fritz G LBI ~ PROJECT DATA Field Test ASTI AS~ Moisture % Density pcf 26.0 95.5 FIELD DENSITY TESTS M/D MOISTURE No. (%) 1 26.8 1 26.3 1 26.0 1 26.5 1 27.7 1 27.1 Test results on this repo~ meet project specification. Test numbers 1 through 4, 24" RCP storm drain - line D. Test numbers 5 through 6, 30" RCP strom drain - line A. Technician: Jesse Landreth Report Distribution: (1) Catellus Development Corporation (I) Gromatzky Dupree & A~qsociates (1) Brockette-Davis-Drake, Iuc. (2) Haws & Tingle 07CC 'llfis report is exclusively for the use of the client indic:tled above and shall uot be reproduced except in Ihll without 4747 Irving Blvd., Sult~ #206 Dadls& Te,r, ss 7~S247 el D-698 d D-2922 ~ D-3017 Project Requlrement~ Motsture Iha~lty -1/+3% 95% DRY DENSITY DENSITY (pc0 (% msx) 92.0 96.3 92.7 97.1 92.9 97.3 92.4 96.8 91.6 95.9 92.0 96.3 Inc. ~aul D. Snfith, P.E. ;enior Project Engineer wrilteu approval of H BC Engineering, ln~. 2-96 ateway-Warehouse Cotton & Gateway