Loading...
Gateway BP(2.3)-LR010323 ENVIRONMEN' w~X ~~, REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Gateway One 555 Dividend Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Ms. Kathy Treat E n 13 i FI E E I=1 ir-I I:S OTECHNICAL AND G R I-'11 I ~ 'AL CONSULTANTS REPORT NO. 54 REPORT DATI-': 03-23-01 REG PROJECt' NO, 7227 DATE OBSERVED: 03-10-01 TECHNICIAN: L. Walton PAGE: 1 of 1 CONTRACTOR: Hill & Wilkinson, Ltd. I Items Observed: I Grade Beam: Core grade beam C-8 B.1 to A.8, line 10 from A.5 to B and I Reference Plans or Notes Used: I Sheet S4.1 I x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was oi respect to the referenced portions of the contract documents. Catellus Development Corporation/ Ms. Kathy Treat Omniplan Architects/ Mr. Jim Patterson Hill & Wilkinson, Ltd./Mr. Jon Wright Hill & Wilkinson, Ltd./ Mr. Joe Schement City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone Submitted by: REED ENGINE Original Signed By James F. Phipp BW/cg Mail Distribution: (1) (1) (1) (1) (1) (1) Extranet Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Jim Patterson Io B-11, line 10.1 from F-8 to E-11. ,served with -'RING GROUP, INC. s, P.E. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ,, TEL [214] 350 5600 · FAX [214] J0 0019