REPORT OF
STRUCTURAL ERECTION INSPECTION
Project:
Client:
Gateway I Rep~
Coppell, Texas Atte:
Reed Engineering Group Date
2424 Stutz, Suite 400
Dallas, TX 75235 Page
REPORT OF INSPECTION
Drawings utilized: Contract Documents
Locations/item inspected:
As noted.
Discrepancies/comments:
As requested, a visual inspection was conducted. Results are as follows:
I.) Roof level framing at columns 8 to 11, grids A to K:
1.) Bearing and welds of joist comply.
2.) Installation of joist bridging complies.
'3.) Bolted and welded beam connections were not ready for inspection.
4.) Installation of perimeter angle complies.
*Open Items
Cecil R McKinney, Jr., CWI #99121311
This report is for the exclusive use of our client and shall not be modified or reproduced without written
VICE, Inc.
5889
irt No: 20759-1
~tion: Keith Atlcins
of Service: 03-23-01
1 of 1
tion Service
approval from said client