Loading...
Gateway BP(2.3)-LR010323 (2)CONTRA C T INSPE C TION SEI 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246, REPORT OF STRUCTURAL ERECTION INSPECTION Project: Client: Gateway I Rep~ Coppell, Texas Atte: Reed Engineering Group Date 2424 Stutz, Suite 400 Dallas, TX 75235 Page REPORT OF INSPECTION Drawings utilized: Contract Documents Locations/item inspected: As noted. Discrepancies/comments: As requested, a visual inspection was conducted. Results are as follows: I.) Roof level framing at columns 8 to 11, grids A to K: 1.) Bearing and welds of joist comply. 2.) Installation of joist bridging complies. '3.) Bolted and welded beam connections were not ready for inspection. 4.) Installation of perimeter angle complies. *Open Items Cecil R McKinney, Jr., CWI #99121311 This report is for the exclusive use of our client and shall not be modified or reproduced without written VICE, Inc. 5889 irt No: 20759-1 ~tion: Keith Atlcins of Service: 03-23-01 1 of 1 tion Service approval from said client