Gateway BP(2.3)-LR010212 GEC ,TECHNICAL AND
ENVIRONMENT~ ~L CONSULTANTS ·
CONTRACTOR: Hill & Wilkinson, L~ ~I
Location of Sample ~
Set Number I Location ~'
1 Building A, Columl~D-7
Design Information'
Source of Concrete I
LMC 1G
Age (~
Date Tested Test
1 3899 02-19-01 7
3899 03-12-01 28
3899 03-12-01 28
3899 Hold H
2 3900 02-19-01 7
3900 03-12-01 28
3900 03-12-01 28
3900 Hold H
Set Cylinder Time of
No. ID Slump Sample
1 3899 9.00 5:00 AM 45
2 3900 9.00 7:00 AM 45
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
(1) Hill & Wilkinson, Ltd./Mr. Jon Wright
(1) Hill & Wilkinson, Ltd./
Mr. Joe Schement
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Catellus Devleopment Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
Extranet
Distribution:
Mail
Distribution:
02-12-01
AN: G. Tsougarakis
Mix Identification I Specified
ITotal Load I Compressive
lbs. Strength p.s.i.
92700 3280
124250 4400
128970 4560
86030 3040
109250 3870
117860 4170
Air Temp.
ConcreteTemp.Entra~
48 N/~
49 N/~
Strength p.s./.
~000
Average
Strength p.s./.
n Ticket
ent Number
4480
4O2O
3120255
3120266
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235
Submitted by:
REED ENGINEE
Odginal Signed By
Keith Atkins
KEA/mrn
· TEL [214] 350 5600 · FAX [214] 35(
RING GROUP, INC.
0019
Cylinder Data
Test Results
No.Set CylinderlID
!
' / ~) CQ~CRETE CYLINDER TEST REPORT
I / ~' / GatewaY One
/ J ~ 555 Dividend
~ t Coppe,l' T exa~s~ /
D TO: ~tellus Development Corporation ~ ~EPORT ~O. 45
4545 Fuller Drive, Suite 105 ~ ~ ~~EGT NO. 7227
I~ing, Texas 75038 t J j ~PLE DATE: 02
Build[n~ ~, Colum~-7 ~ ' 501200
2 Buildino ~, Golumn H-3 .~ ~01200
REPORTED TO:
GE
ENVIRONMEN'
CONCRETE CYLINDER TEST REPORT
Gateway One
555 Dividend
Coppell, Texas
Catellus Development Corporation
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Ms. Kathy Treat
CONTRACTOR: Hill & Wilkinson, Ltd.
Location of Sample
OTECHNICAL AND I I:~ F~I r-~ I I F:~
'AL CONSULTANTS
I
REPORT NO. 45
REG PROJECT NO. 7227
SAMPLE DATE: 02-12-01
TECHNI(
Set Number I Location l Quantity
;lAN: G. Tsougarakis
'~epresented
1 Building A, Column D-7 50/200
2 Building A, Column H-3 160/200
Design Information
Source of Concrete Mix Identification Specifim Strength p.s.i.
3000
Age@ Total LoadI Compressivfl I
Date Tested Test lbs. Strength p.sli.
02-19-01 7 92700 3280
03-12-01 28
03-12-01 28
Hold H
Average
Strength p.s.i.
I I
I LMC 1G
Test Results
Set Cylinder I
No. ID
1 3899
3899
3899
3899
2 3900
3900
3900
3900
02-19-01 7
03-12-01 28
03-12-01 28
Hold H
86030 3040
Cylinder Data
Set CylinderI Time ofI
No. ID Slump SamPle Air Temp.
1 3899 9.00 5:00 AM 45
2 3900 9.00 7:00 ,AM 45
ConcreteI ia/~'n' I Ticket
Temp. Entr ment Number
48 ~/A 3120255
49 /A 3120266
Mail
Distribution:
Extranet
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Pafferson
(1) Hill & Wilkinson, Ltd./Mr. Jon Wright
(1) Hill & Wilkinson, Ltd./
Mr. Joe Schement
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Catellus Devleopment Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
Submitted by:
REED ENGINE
Original Signed By
Keith Atkins
KENmm
ERING GROUP, INC.
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019