Loading...
Gateway BP(2.3)-LR010305REPORTED TO: CONTRACTOR: I Items Observed: GE ENVIRONMENq REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Gateway ~.~' }.. 2. 1~ 555 Dividend Coppell, Texas Catullus Development Corporation 4545 Fuller Ddve, Suite 105 Irving, Texas 75038 ATTN: Ms. Kathy Treat Reference Plans or Notes Used: REPORT NO. , REPORT DATE ::)TECHNICAL AND AL CONSULTANTS ~7 [: 03-05-01 7227 02-23-01 REG PROJECT NO. DATE OBSERVED: TECHNICIAN: PAGE: 1 of 1 Hill & Wilkinson, Ltd. I First Level Slab: Lines B to K betwee I Structural Drawings R. Bullion Lines 2.2 and 3. I X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was ob respect to the referenced portions of the contract documents. Mail Distribution: (1) Catullus Development Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Jim Patterson (1) Hill & Wilkinson, Ltd./Mr. Jon Wdght (1) Hill & Wilkinson, Ltd./ Mr. Joe Schement . (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEE Original Signed By James F. Phipp,~ BW/myw Extranet Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) Omniplan Architects/ Mr. Jim Patterson ~erved with !RING GROUP,"INC. P.E. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 35 0019