Gateway BP(2.3)-LR001117 (2)REPORTED TO:
CONTRACTOR:
Gl
ENVIRONMEN
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Gateway One
555 Dividend
Coppell, Texas
Catellus Development Corporation
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Ms. Kathy Treat
iOTECHNICAL AND J ~ F:~ r-t U F:=
r'AL CONSULTANTS
I
Mail
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
(1) Hill & Wilkinson, Ltd./Mr. Jon Wright
(1) Hill & Wilkinson, Ltd./
Mr. Joe Schement
(1) City of Coppell/Mr. Larry Davis
(1) City of C0ppell/Ur. Lee Stone
Submitted by:
REED ENGINEE
Original Signed By
James F. Phipp.,
KA/mm
Extranet
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) Omniplan Architects/
Mr. Jim Patterson
2424 STUTZ DR. * SUITE 400 ,, DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 351
The reinforcing steel placed at the above referenced locations was ol
respect to the referenced portions of the contract documents.
[ X There were no deviations noted.
Reference Plans or Notes Used: I Sheet S-4.1 and Detail 10
~erved with
~RING GROUP, INC.
P.E.
0019
Grade beams for canopy, from Line
Hill & Wilkinson, Ltd.
Items Observed:
REPORT NO. 21(Revised)
REPORT DATI-': 11-17-00
REG PROJECT NO. 7227
DATE OBSERVED: 11-11-00
TECHNICIAN.:'H. Johnson
PAGE: 1 of I
from 8 to 11.