Gateway BP(2.3)-LR010309CONTRA CT INSPECTION SEI
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-:
REPORT OF
STRUCTURAL ERECTION INSPECTION
Project: Gateway I Repo
Coppell, Texas Atte~
VICE, Inc.
~889
rt No: 20603-1
~tion: Keith Atkins
Client: Reed Engineering Group Date of Service: 03-09-01
2424 Stutz, Suite 400 [
Dallas, TX 75235 Pa§e~ 1 of 1
REPORT OF INSPECTION
Drawings utilized:
Locations/item inspected:
Contract Documents
As noted.
Discrepancies/comments:
A visual inspection was conducted. Results are as follows:
I.) 1st floor and 2nd floor level at columns 1 to 2, grids B to K, Building A:
1.) Metal floor deck:
A.) Puddle welds comply for size, fusion and pattern using weld was[
Cecil McKinney, Jr., CWI//99121311
Technician Co la
r
This report is for the exclusive usc of our client and shall not be modified or reproduced without written
~ection Service
pprovnl from said client