Loading...
Gateway BP(2.3)-LR010309CONTRA CT INSPECTION SEI 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-: REPORT OF STRUCTURAL ERECTION INSPECTION Project: Gateway I Repo Coppell, Texas Atte~ VICE, Inc. ~889 rt No: 20603-1 ~tion: Keith Atkins Client: Reed Engineering Group Date of Service: 03-09-01 2424 Stutz, Suite 400 [ Dallas, TX 75235 Pa§e~ 1 of 1 REPORT OF INSPECTION Drawings utilized: Locations/item inspected: Contract Documents As noted. Discrepancies/comments: A visual inspection was conducted. Results are as follows: I.) 1st floor and 2nd floor level at columns 1 to 2, grids B to K, Building A: 1.) Metal floor deck: A.) Puddle welds comply for size, fusion and pattern using weld was[ Cecil McKinney, Jr., CWI//99121311 Technician Co la r This report is for the exclusive usc of our client and shall not be modified or reproduced without written ~ection Service pprovnl from said client