Loading...
Gateway BP(2.3)-LR010312CONTRA CT INSPECTION SEJ 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246 REPORT OF STRUCTUR~ ERECTION INSPECTION Project: Gateway I Rep, Coppell, Texas Att, Client: Reed Engineering Group Da~ 2424 Stutz, Suite 400 Dallas, TX 75235 ~ ' ' ~Pag~ REPORT OF INSPECTION Drawings utilized: Contract Documents Locations/item inspected: As noted. Discrepancies/comments: As requested, a visual inspection was conducted. Results are as follows: I.) Building A and B, second floor and roof level framing at comer beam cm 1 I/J, 18/J and 18/A) were found to be non-compliant due to: * 1.) Beam support lugs not welded as detailed (S5.2/7), also weld size a~ inspected due to slag not removed. *2.) Bolted connections, several bolts and washers missing, several bolts *Open Items Cecil McKinney, Jr., CWI g99121311 Technician This report is for the exclusive use of our client and shall not be modified or reproduced without written VICE, Inc. .5889 }at No: 20606-1 ation: Keith Atkins of Service: 03-12-01 , 1 of 1 ::: ~::: :3 ~:: .'2: ~: .~:~:~: :~: ~ ~:~ ~: :~: :.~ ~:[~.'.":: :3:::: ¢.~-'.:: ~ :~:.~.:~":~: :~:~: :~:~:~: :-: :-"".': ~-::~ '~'l nection (lB, I/K, 8/K, d profile was not were not tensioned. ~ection Service pproval from said client