Loading...
Gateway BP(2.4)-CS 990420COPPELL, TEXAS 75019 Pat Acker, P.E. HalffAssociates 8616 Northwest Plaza Drive Dallas, Texas 75225 RE: Gateway Business Park No. 2, Lot 2 Bloek,~ Fee Assessment Letter Dear Mr. Acker Enclosed is a copy of the City of Coppell Development Fee Assessment a copy of the Development Fee calculations for the referenced developme~ Please make payment to the City of Coppell in the amount of $50,130.59 the Finance Department along with a copy of the Fee Assessment table. ~[ portion of the assessed fees that need to be paid prior to Council approval. the attached table for additional fees. Also provide a copy of the Engine~ contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department verify the payment of required fees and insure a successful beginning of! look forward to working with you on this project. If you have any qt contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services P.O. Box 478 Coppell, Texas 75019 972-462-0022 April20,1999 ble, along with rt. and forward to his amount is a Please refer to · 's estimate or will help us to his project. We testions, please DEVELOPMENT FEE TABLE Project: Gateway Business Park No. II, Lot 2 Block A Date: 4/20/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,098.83 (100 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $6,626.45 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $31,005.59 $31,005.59 (100% due prior to Council Approval) Street Light Fee Information not Ava lable (100% due prior to Acceptance of Project II Street Sign Fee Information not Ava ]able (100% due prior to Acceptance of Project I] Construction Inspection Fee Information not Ava ~able II FOTAL $58,280.87 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $50,130.59 DEVELOPMENT FEE WORKSHEET PROJECT: Gateway Business Park No. 11, Lot 2 Block A DATE: 4/20/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 3 inch = 16 ES 1 - 2 inch = 8 ES 0 = 0 ES 2 - 8 inch = 2.5 ES Total #: 26.5 ESU's @ $450.00 ea. (100% due pdor to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $1,098.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigatio~/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $192.05 $0.00 $3,217.20 Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) IrrigationfFire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 U's U'S U's U'S $11,925.00 $200.00 $1,098.83 $192.05 $0.00 $6,434.40 $35.00 $90.00 $7,2O0.O0 $50.00 $50.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $o.o0 $31,005.59 Information not Available Information not Available Information not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Gateway Business Park No. II, Lot 2 Block A 4/20/99 ROADWAY IMPACT FEE: Service Area * 10 Category ** Office Land Use ** General Office 15ldo. Building Area Of) 103,611 Development Units ** 103.61 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- * (Figure 2 - Roadway ** (Table 3 - Roadway *** (Schedule 2, Page 3 - Roadway Percent of Credit Toward Roadway Impact Fees Total Credit $124,022.37 i Impact Fee Study) Impact Fee Study) Impact Fee Study) 75% $93,016.78